Back to search

ENERGIX-Stort program energi

Multi-storage systems for multi-markets under multi-time horizons

Alternative title: Energilagringssystemer for flere markeder med ulike tidshorisonter

Awarded: NOK 8.0 mill.

The power grid has traditionally been operated using large production plants from which the electric power is being dispersed to the end-users. However, the integration of variable renewable energy sources (VRES) is happening at an accelerated rate, largely facilitated by the drop in prices for wind and solar power. Consequently, the power system is shifting from primarily consisting of centralized power plants towards more distributed energy production. At the same time, there are larger power and energy demands due to the increased electrification, e.g., within the transport sector and industry. The intermittent nature of production from VRES will often not coincide with the energy demand. Therefore, energy storage solutions such as battery energy storage systems (BESS) and hydrogen energy storage systems (HESS) are expected to be important for integrating large shares of VRES in the power system. However, high investment cost is still one of the main barriers for large scale deployment of BESS. Hydrogen is better suited for long-term energy storage but is considered an inefficient energy carrier due to the large amounts of energy lost during production. Increasing the deployment of BESS and HESS will, thus, require further development of these technologies to reduce costs and improve efficiency. However, it also requires a better understanding of how they should be operated to maximize their socio-economic benefits. Therefore, the MultiStore project aims to develop operation strategies for these energy storage technologies to further facilitate more VRES in the power grid. These strategies can then be used to get a better understanding of the challenges and the incentives required to deploy and combine different energy storage solutions.

MultiStore will develop control and operation strategies for battery energy storage systems (BESS) and hydrogen energy storage systems (HESS) with the aim of maximizing their socio-economic benefits to further facilitate more VRES in the power grid. Operation algorithms for both the owners (bottom-up) and the grid operators (top-down) will be developed and used to get a better understanding of the incentives required to deploy and combine different energy storage technologies.

Funding scheme:

ENERGIX-Stort program energi

Thematic Areas and Topics

No thematic area or topic related to the project