0 projects

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

pre-proejct: 3D ray-based seismic imaging in complex geologies

Ray-based methods are often seen as not accurate enough for the imaging of complex geology. However, proper implementations can mitigate the inherent limits of those methods. Velocity model estimation and imaging are concerned. Both rely on an optimized and accurate seismic migration code. Both ...

Awarded: NOK 39,718

Project Period: 2008-2009

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Vertical transport of liquids in petroleum production

...

Awarded: NOK 0.86 mill.

Project Period: 2008-2009

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Rapid transportation of complex fluid mixes.

An effective way of planning and operating process plants and pipeline networks is the use of simulations. Accurate simulations make it possible to cut costs and increase the safety and accuracy of the estimated capacity and thus increase the capacity. An important part of this is the understand...

Awarded: NOK 65,176

Project Period: 2008-2008

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Optimization of operation control, capacity estimation and monitoring of gas transport

The Norwegian gas production is transported in large diameter pipelines to Europe, covering around 15% of the European natural gas consumption. Otimal operation of this network is necessary to continue developing the competitive edge of Norwegian natural gas in Europe, and also embedded in TTA8. ...

Awarded: NOK 58,135

Project Period: 2008-2009

Location: Rogaland

PETROMAKS2-Stort program petroleum

URE - Uncertainty in Reservoir Evaluation - High-Contrast Spatial Features

Project summary: After decades of research on stochastic reservoir characterization, mapping of average properties and representation of heterogeneities are in frequent use in the petroleum companies. Methodologies for data integration and uncertainty ar e also available. Focus of the current pr...

Awarded: NOK 6.4 mill.

Project Period: 2008-2013

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Biota Guard IO Center

Oljeindustrien er konfronert med stadig større krav til faktabasert bevisførsel for å kunne dokumentere at offshore bore- og produksjonsoperasjoner blir gjennomført på en miljømessig forsvarlig måte. Kravene forsterkes etterhvert som industrien flytter si n aktivitet til nye og mer miljøsensitive...

Awarded: NOK 99,999

Project Period: 2008-2008

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Vascular gas bubbles and endothelial damage in relation to saturation diving.

The research project suggested is part of a competence program in diving initiated by StatoilHydro going from 2007 to 2011, but needs additional financial support to be completed. The major challenge for all parties involved in the exploitation of the o il and gas resources is to secure that ma...

Awarded: NOK 4.1 mill.

Project Period: 2008-2011

Location: Trøndelag - Trööndelage

PETROMAKS2-Stort program petroleum

Novel biomarkers for the prediction of health consequences from occupational exposure to benzene in 12 versus 8 h work shifts

There has recently been reported an increased risk of blood derived malignancies among Norwegian offshore workers. This could indicate that the exposure to carcinogenic benzene has been higher than published for this industry, or that the increased risk f or these malignancies can be found at low...

Awarded: NOK 9.2 mill.

Project Period: 2008-2013

Location: Vestland

PETROMAKS2-Stort program petroleum

Working hours,health,and safety in the petroleum industry, A longitudinal prospective study.

Hovedmål med studien var å bestemme om skift/natt arbeid sammen med psykososialt arbeidsinnhold har betydning for mentale helseplager blant onshore- og offshoreansatte i norsk petroleumssektor. Deltakerne besvarte spørreskjemainstrumenter to ganger: 1772 (av 3258 inviterte = 54,4%) besvarte førs...

Awarded: NOK 4.4 mill.

Project Period: 2008-2015

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Safe diving - endothelial damage and cellular defence mechanisms

...

Awarded: NOK 2.0 mill.

Project Period: 2008-2012

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Oljelense generasjon III

Dagens oljevernutstyr har begrensninger tilknyttet bølgehøyde, strøm og det å operere i mørke. Dette kan føre til at en i praksis bare kan kontrollere oljesøl i 40-50% av tiden. I tillegg tar det i mange tilfeller lengre tid å mobilisere og plassere utsty r i opptaksposisjon enn det tar olje å dr...

Awarded: NOK 99,999

Project Period: 2008-2009

Location: Nordland - Nordlánnda

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Akselerert hydratisering / herde- stabiliseringsprosess samt granulering av borekaks

Prosjektet er en videreutvikling av pågående borekaksprosjekter ved Sintef, Trondheim og Sintef Byggforsk, Oslo. Prosjektene ledes av prof. Harald Justnes, Sintef, Trondheim samt av to sentrale medarbeidere. Dr. ing. Hedda Vikan, Sintef, Trondheim og Osl o, innen sementteknologi, og forsker, dok...

Awarded: NOK 99,999

Project Period: 2008-2008

Location: Agder

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Remote and Continuous Reservoir Pressure Monitoring using Sealed Annulus Measurement Device

There is currently a need to improve the understanding of reservoir properties to enhance the development strategy of hydrocarbon discoveries. Especially the vertical communication within a reservoir is often highly uncertain. The ability to quantify the vertical communication within reservoir se...

Awarded: NOK 99,999

Project Period: 2008-2009

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Arctic standards

In cooperation with Petromaks develop projects on Russian Environmental Standards. Russia has over many years developed "Maximum Permissible Levels" (MPL)for a number of contaminants, chemical and physical topics in water, soil and biota. These standards are base for their national environmental ...

Awarded: NOK 99,999

Project Period: 2008-2009

Location: Troms - Romsa - Tromssa

PETROMAKS2-Stort program petroleum

MaxWells - Wells for Maximum Value Creation

Primary objective of project: To advance the state of the art in decision support methodology and closed loop control to meet current and future challenges of constructing smart well systems for the Norwegian oil and gas industry, taking into full conside ration the new environment established by...

Awarded: NOK 12.5 mill.

Project Period: 2008-2013

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

AutoConRig - Semi-autonomous control system for unmanned drilling rigs

...

Awarded: NOK 6.6 mill.

Project Period: 2008-2012

Location: Agder

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Shift work and Health in the Norwegian Petroleum Sector: Employees' Work-Personal Life Integration

The main research task in this project is to develop new research-based knowledge about onshore and off-shore employees focusing on a) their family experiences and challenges with the transition from shift work off-shore/on-shore to off-work situation and daily family-life, and to b) to compare ...

Awarded: NOK 1.9 mill.

Project Period: 2008-2012

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

SECurus Oil Spill IR Information System

...

Awarded: NOK 3.5 mill.

Project Period: 2008-2009

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

SUP: Offshore Wind Energy in Norway: Setting the Basis

Norway has massive offshore energy resources. Offshore wind energy by means of floating structures may open a third energy era in Norway, following hydropower and petroleum. The resource is renewable and lasting. The project objective is to improve the ex isting knowledge in the design, interconn...

Awarded: NOK 12.0 mill.

Project Period: 2008-2012

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Development of Seabed Drilling Rig, Co-operation with Universities

...

Awarded: NOK 0.97 mill.

Project Period: 2008-2009

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Oil spill containment by use of air bubbles

The proposed project will evaluate the use of air bubbles to improve oil spill recovery operations. When a large number of bubbles is released in water, the rising bubble plume induces an upward transport of water (upwelling), which consequently spreads o ut at the surface (outwelling). The outwe...

Awarded: NOK 4.9 mill.

Project Period: 2008-2012

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Water Weakening of Chalk - Physical and Chemical Processes

Chalk is an important reservoir rock, e.g., Ekofisk and Valhall fields. In the 90s, a dramatic increase in subsidence rate at Ekofisk was experienced after seawater injection. A similar effect is also observed in the laboratory. When chalk cores experienc e stress higher than yield, they tend to ...

Awarded: NOK 6.6 mill.

Project Period: 2008-2010

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Construction of metagenome libraries for use in oil reservoir characterization

Exploration of oil reservoir microbiology is currently being carried out with the prospect of yielding new methods and microbes/enzymes for use in searching for new oil prospects, microbial increased oil recovery and biocatalytic upgrading of oil fraction s. One powerful method for exploring envi...

Awarded: NOK 6.4 mill.

Project Period: 2008-2012

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Identification of rock and material properties with new 2-frequency ultrasound technique

The proposed project uses new, dual frequency ultrasound methods to addresses ultrasound identification of material properties such as rock properties during drilling and properties of polymer walls in flexible risers. New, dual frequency ultrasound metho ds (SURF methods) have been developed at ...

Awarded: NOK 3.7 mill.

Project Period: 2008-2011

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Operational Aspects of a Uniform Seismic Sensor Grid

...

Awarded: NOK 1.4 mill.

Project Period: 2008-2010

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Arctic Materials - Materials technology for safe and cost-effective exploration and operation under arctic conditions

Oil and gas exploration and operation under arctic conditions poses several specific challenges. These are related to low temperatures, large temperature variations, and large deformations. The sensitive environment also puts strict requirements with rega rds to safety. Materials technology plays...

Awarded: NOK 25.0 mill.

Project Period: 2008-2012

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Fast Elastic Inversion of Multi-offset Prestack Depth Migrated Seismic Data

...

Awarded: NOK 6.3 mill.

Project Period: 2008-2010

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Solid Separation from Highly Viscous Liquids by Cyclonic Technology

This is a proposal for a research project, which focuses on generating and applying basic knowledge about the separation of sand from liquids such as heavy crude oil and mono-ethylene glycol, also when mixed with water. The project will involve efficiency testing, experimental particle tracking ...

Awarded: NOK 2.5 mill.

Project Period: 2008-2012

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Reservoir characterization using ensemble Kalman filter

This project aims at improved reservoir characterization through better utilization of production data. It will focus on using the ensemble Kalman filter (EnKF) technique for updating reservoir simulation models to take production data into account and at the same time honoring the prior geologi...

Awarded: NOK 9.6 mill.

Project Period: 2008-2011

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Risk Modelling, Integration of Organisational, Human and Technical factors

There is considerable knowledge about how human performance may help to prevent accidents in the general, qualitative sense. There is also qualitative knowledge about how human errors may contribute to causing accidents. But there is quite limited knowled ge about how the performance of organisat...

Awarded: NOK 7.8 mill.

Project Period: 2007-2011

Location: Rogaland