Alternative title: Integrating GIS and BIM in AEC projects

Awarded: NOK 1.7 mill.

Project Manager:

Project Number:

290676

Project Period:

2018 - 2024

Funding received from:

Organisation:

Location:

During the last decades, productivity in the construction industry has not increased as much as in other industries. Using the potential that lies within digital transformation to achieve faster planned, projected and completed projects seems like a promising response to reverse this trend. While the construction industry traditionally is not an early adaptor to new trends, new demands from public clients are pushing the industry towards digital transformation. All parts of society are facing significant changes - including the construction industry. One possible approach to the digital transformation of the construction industry has been identified as increased and effective use of information in projects. Software development has made it possible to produce information-rich Building Information Models (BIM) for both buildings and infrastructure projects. Beside graphical information stored in the model (the geometry) there is also non-graphical information that is important in construction projects like e.g. information about quantities and materials. This non-graphical information is especially important for automation, an important part of the digital transformation. To create value from the available information within construction projects information management is necessary. Both research activities, standardization, governmental and industry initiatives stress the importance of information management to rise the productivity of the construction industry. While researchers started to investigate the integration of graphical information there is little research on the integration of both graphical and non-graphical information into one combined information model. To delimit the field of research, a model use with great potential for digital transformation was selected, namely automated quantity take-off. This PhD project will contribute to the state-of-the-art by: - providing empirical data from projects with a high level av digitalization - providing an overview of cost-related information - providing an overview of redundant information - testing different integration methods of both graphical and non-graphical-information This research is an industry PhD with the overall goal of improving the product that designers in the construction industry deliver to their clients. In detail the research will focus on, but not be limited to the following objectives: 1. Map the current use of cost-related information in projects with a high level of digitalization 2. Investigate experiences with the available cost-related information 3. Evaluate the consequences of the available cost-related information 4. Improve the available information by increasing the reliability Infrastructure projects will be used as cases for existing use of BIM and for testing of improvement proposals through integration of GIS information. The resulting knowledge may be useful for future projects.

Byggeprosjektene som COWI deltar i blir stadig større og mer komplekse samtidig som konkurransen blir tøffere. For å stadig kunne vinne nye oppdrag er det et behov for både å redusere gjennomløpstiden for prosjektene samtidig som det rent faktisk brukes færre timer enn tidligere. Et sentralt element i en slik effektiviseringen er en effektiv bearbeiding av tilgjengelig data slik at dataene fremstår som relevant informasjon i de ulike delene av prosjektgjennomføringen. BIM (BygningsInformasjonsModell) hjelper til å oppnå målet og er kort fortalt en prosess basert på informasjonsrike 3d modeller. I denne PhD-en vil transformasjonen fra data til informasjon for å understøtte beslutninger stå sentralt. For å kunne utveksle data mellom ulike programmer må dataene være standardiserte og man trenger programvare for å kunne redigere dataene. Standardisering av utvekslingsformater og ulike typer programvare er i stadig utvikling. Informasjon fra ulike offentlige forvaltere (såkalt GIS-informasjon) i ferd med å bli gjort tilgjengelig i mer brukervennlige systemer. BIM-baserte prosjekter produserer økende datamengder for det spesifikke prosjektet. Utfordringen i dagens prosjekter er derfor ikke å finne eller skape data, men å sette dataene sammen til meningsfull informasjon. Spesielt vurderes det å være et potensiale i integreringen av data fra GIS-systemer til BIM . Dette forskningsprosjektet vil handle om hvordan de prosjekterende kan sette sammen den riktige kombinasjonen for hver enkelt målgruppe på riktig tidspunkt i prosjektet slik at all relevant informasjon foreligger på en forståelig måte og uten at den drukner i en mengde irrelevante data. Vi tror dette vil bidra til bedre og hurtigere beslutninger og dermed til kortere prosjekteringstid.

Funding scheme: