0 antall prosjekter

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Bidrag til Society of Petroleum Engineers (SPE) sin konferanse med lansering av bok om petroleumsforskning

...

Tildelt: kr 49 999

Prosjektperiode: 2004-2005

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

SILD Phase 2 - A new concept for Environmental Friendly Well Testing and Reservoir Fluid Sampling

...

Tildelt: kr 2,7 mill.

Prosjektperiode: 2004-2007

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Reel-Well - Drilling and Well Concept

The concept is based on a new patented idea of well construction. The idea is to perform the drilling operation with a dual drill string and a downhole movable packer, which implies a re-arrangement of the drilling fluid hydraulics compared to conventiona l drilling. The method can utilise modern...

Tildelt: kr 1,2 mill.

Prosjektperiode: 2004-2005

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

TERMINERT! Cumulative light hydrocarbon parameters: Calibration of models for the process of cumulative filling and mixing of reserv

The processes of oil generation and entrapment are complex and dynamic, though at a slow rate. The composition of the oil expelled by the source rock changes throughout the generation period, giving different inputs into the reservoir over time. Incorp oration these aspects into quantitative b...

Tildelt: kr 0,60 mill.

Prosjektperiode: 2004-2006

Sted: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Sustainable produced water treatment by increasing the operational window of the Epcon CFU to include treatment of solids.

...

Tildelt: kr 2,1 mill.

Prosjektperiode: 2004-2007

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. SWIT - Subsea water injection and treatment

The main objective of this R&D project is to develop a system for subsea water injection and treatment (SWIT). It will be designed to significantly reduce the cost of water injection into subsea reservoirs, thus contributing towards increased oil recovery (IOR). The project is a response to the...

Tildelt: kr 99 999

Prosjektperiode: 2004-2005

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Molecular tools in oil and gas exploration

A principle objective in the Norwegian oil and gas policy is to achieve oil production for 50 years and gas output in a century-long perspective. The recoverable petroleum resources on the NCS were estimated to total 13.8 billion scm oe at 2001 and 28 % o ut of this remain to be discovered. There...

Tildelt: kr 3,1 mill.

Prosjektperiode: 2004-2008

Sted: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

VISPO 3D

...

Tildelt: kr 0,60 mill.

Prosjektperiode: 2004-2005

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Formation of piercement structures in sedimentary basins

Piercement structures such as mud volcanoes, hydrothermal vent complexes, and breccia pipes are common in many sedimentary basins. The structures are commonly formed by vigorous eruptions transporting fluids and material from a deep source area to a vent at the surface. The high-permeability cyli...

Tildelt: kr 4,7 mill.

Prosjektperiode: 2004-2007

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Waterflooding of carbonate reservoirs - Optimization and improved oil recovery

Oil recovery from carbonate reservoirs is more or less dictated by the wetting condition of the reservoir. Opposite to sandstone reservoirs, about 90% of the carbonate reservoirs are believed to be neutral to oil-wet. The oil properties described by the a cid and base number appeared to play an i...

Tildelt: kr 3,2 mill.

Prosjektperiode: 2004-2008

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Continuous updating of reservoir simulation models and improved reservoir management

To fully exploit the increased use of permanent sensors for monitoring pressure, temperature and flow rates it is natural to consider methods for continuous updating of the reservoir simulation models from this information. The main task of this project i s to make the ensemble Kalman filter tech...

Tildelt: kr 4,1 mill.

Prosjektperiode: 2004-2007

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Subsea Condition Monitoring using detached acoustic sensors

...

Tildelt: kr 0,91 mill.

Prosjektperiode: 2004-2005

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Development of Dynamic Model for CMP - Controlled Mud Pressure System

...

Tildelt: kr 4,7 mill.

Prosjektperiode: 2004-2006

Sted: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Frontier Science and Exploration: The Atlantic - Arctic

We propose linking academic and industrial research and data exchange in order to refine plate reconstruction and basin evolution models, characterize continental-ocean boundaries (COBs) and investigate links between Large Igneous Provinces (LIPs) and Pla te Tectonics. State-of-the-art understand...

Tildelt: kr 3,3 mill.

Prosjektperiode: 2004-2007

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Downhole Production Monitoring System (DPMS)

...

Tildelt: kr 6,0 mill.

Prosjektperiode: 2004-2007

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Managed Pressure Drilling (MPD), incl Underbalanced Drilling (UBD); A new and safe workprocess by integrating software modelling

...

Tildelt: kr 1,7 mill.

Prosjektperiode: 2004-2006

Sted: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

Smart shuttle

...

Tildelt: kr 2,1 mill.

Prosjektperiode: 2004-2006

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Physics of Oil Recovery

Under this very broad heading, we present in the following three projects where we propose to use our expertise in the physics of soft and complex matter on urgent problems faced by the oil industry in their efforts to increase the productivity of existin g and new reservoirs. The three principa...

Tildelt: kr 6,2 mill.

Prosjektperiode: 2004-2009

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Tectonic development and temperature history of the Vøring area, mid Norway

The Vøring area covers a large part of the southern Norwegian Sea where exploration has been done since the early 90's. The area is large and there is still a considerable lack of knowledge about the geological/tectonic development and the corresponding h eat flow history of the area. The Vøring...

Tildelt: kr 8,5 mill.

Prosjektperiode: 2004-2008

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Three-dimensional seismic angle migration and tomography

In this project we will associate the leading edge position of NTNU, represented by Bjørn Ursin, in the field of angle migration, with the high competence and experience of SINTEF with developing algorithms for 3D imaging in complicated geology In the f irst part of the project we plan to exten...

Tildelt: kr 1,4 mill.

Prosjektperiode: 2004-2007

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Geologic reservoir caracterisation. Alluvial deposits, controlling factors, processes, architectural style and hetrogeneities

The aim of the project is to understand the main factors controlling fluvial systems and their geometry in different sedimentary basins. The object is to develop models from outcrop studies that can be used as predictive tools in subsurface petroleum expl oration and production in fluvial reservo...

Tildelt: kr 3,7 mill.

Prosjektperiode: 2004-2008

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Petrophysical properties of mudstones and sandstones and their seismic response.

The aim of the project is to understand the main factors controlling the degree of sediment compaction (porosity loss) in sedimentary basins and the change in physical characteristics such as compressibility and seismic velocities. We will use data from m echanical experiments combined with wire ...

Tildelt: kr 3,6 mill.

Prosjektperiode: 2004-2008

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

AKSIO - Active Knowledge System for Integrated Operations

...

Tildelt: kr 7,0 mill.

Prosjektperiode: 2004-2009

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Efficient reservoir characterization and production optimization using the augmented Lagrangian and level set methods

Updating of reservoir models with respect to dynamic data is a major challenge, which requires large effort from the field subsurface asset teams. Also, optimal use of available platform process capacities is a major challenge, especially for mature fiel ds with many wells, and for fields with n...

Tildelt: kr 4,7 mill.

Prosjektperiode: 2004-2007

Sted: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Fault Facies

The project work encompasses two stages, each covering three sub-themes/research tasks and requiring the integration of geology, geophysics, rock mechanics, mathematics, engineering and programming in order to succeed. Stage 1: As the fault facies (FF) project represents an entirely new concept...

Tildelt: kr 9,0 mill.

Prosjektperiode: 2004-2007

Sted: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Improved Oil Recovery in Heterogeneous Reservoirs

More than 50% of the oil is left behind after oil production is completed in most of the oil reservoirs on the Norwegian continental shelf. This is not acceptable in a global energy perspective. The single most important reason for such a low oil recovery is reservoir heterogeneities, i.e. varia...

Tildelt: kr 5,0 mill.

Prosjektperiode: 2004-2008

Sted: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Mineral phase transitions control on basin subsidence: The role of temperature, pressure, fluids and melting

The project focuses on studying and modeling the impact of metamorphic reactions within the crust and lithospheric mantle on the formation of extensional sedimentary basins. The volume changes of metamorphic reactions invariably cause changes in the bulk densities of lithospheric units. Numerical...

Tildelt: kr 6,2 mill.

Prosjektperiode: 2004-2008

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Singing Risers - National competence building initiative on turbulent flow for optimum flow control of gas in export risers and flowlines.

Floating production platforms in the North Sea and Arctic Frontier have experienced severe vibration and noise problems due to high frequency vibrations in flexible risers. This problem, related to large-diameter, composite flexible pipes used for gas ex port and gas injection, has been experien...

Tildelt: kr 6,1 mill.

Prosjektperiode: 2004-2008

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Three-dimensional numerical forward modelling of submarine massflow processes and sedimentary successions

...

Tildelt: kr 1,9 mill.

Prosjektperiode: 2004-2008

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

TuMod, Integrated Turbidite Modelling

The best method for accurately representing the distribution of petrophysical properties within a reservoir is by representing the geometries of the facies and then populating facies bodies with petrophysical properties. Therefore, any future tools for mo delling turbidite reservoirs will need to...

Tildelt: kr 3,3 mill.

Prosjektperiode: 2004-2008

Sted: Oslo