0 antall prosjekter

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Singing Risers - National competence building initiative on turbulent flow for optimum flow control of gas in export risers and flowlines.

Floating production platforms in the North Sea and Arctic Frontier have experienced severe vibration and noise problems due to high frequency vibrations in flexible risers. This problem, related to large-diameter, composite flexible pipes used for gas ex port and gas injection, has been experien...

Tildelt: kr 6,1 mill.

Prosjektperiode: 2004-2008

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Three-dimensional numerical forward modelling of submarine massflow processes and sedimentary successions

...

Tildelt: kr 1,9 mill.

Prosjektperiode: 2004-2008

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

TuMod, Integrated Turbidite Modelling

The best method for accurately representing the distribution of petrophysical properties within a reservoir is by representing the geometries of the facies and then populating facies bodies with petrophysical properties. Therefore, any future tools for mo delling turbidite reservoirs will need to...

Tildelt: kr 3,3 mill.

Prosjektperiode: 2004-2008

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Virtual Outcrop Geology

Data collected from outcrops have long been central to our understanding of the shape and form of both sedimentary and structural reservoir heterogeneites. Recent advances in subsurface reservoir technology has allowed the representation of these entities in 3D within computer systems, which in ...

Tildelt: kr 6,5 mill.

Prosjektperiode: 2004-2009

Sted: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

An Operation Center for Design, Implementation and Testing of New Work Processes for Real-Time Reservoir and Production Management

...

Tildelt: kr 5,4 mill.

Prosjektperiode: 2004-2008

Sted: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Evaluation of the Delta-K Method for delineation of reservoir structure - a feasability study

Conventional seismic imaging relies on recovering a broad bandwidth impulse from the target reflectors. The Delta-K approach, as pioneered in both radar and sonar imaging by Triad AS, offers the promise of improved imaging performance for both conventiona l and time-lapse surveys. A scattering vo...

Tildelt: kr 0,25 mill.

Prosjektperiode: 2004-2005

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Tectonic development and temperature history of the Vøring area, mid Norway

The Vøring area covers a large part of the southern Norwegian Sea where exploration has been done since the early 90's. The area is large and there is still a considerable lack of knowledge about the geological/tectonic development and the corresponding h eat flow history of the area. The Vøring...

Tildelt: kr 8,5 mill.

Prosjektperiode: 2004-2008

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Pressure and stress interactions in sedimentary basins

The proposed project will focus on integrating rock-mechanical evaluations (stress modelling) and a dynamic fluid flow (pressure modelling) and its importance in oil and gas exploration. The project and the co-operation between the three participating ins titutes were initiated in 1995 through th...

Tildelt: kr 6,0 mill.

Prosjektperiode: 2004-2007

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Time Coded Impulse Seismic Technique for Marine Reservoir Monitoring

Various methods have been used in order to generate the signal that is transmitted into the ground and provides mapping of a reservoir by means of seismic reflection. ?Air-gun? is the most commonly used seismic source. The principle of an ?Air-gun? is som ewhat similar to an explosion in the way ...

Tildelt: kr 2,9 mill.

Prosjektperiode: 2004-2008

Sted: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Carbonate Reservoir Geomodels

We will gain crucial information on the 3D geometry of fluid-flow units and spatial distribution of their petrophysical characteristics, in the following play types: (1) Cretaceous karstic shelf deposits, Cretaceous slope/base-of-slope deposits, and Eoce ne slope deposits, exposed in Italy (Garg...

Tildelt: kr 15,0 mill.

Prosjektperiode: 2004-2008

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Include further enhancements into the Mepo optimisation software environment with application to history matching in res. (Arne Gulbrandsen)

...

Tildelt: kr 1,1 mill.

Prosjektperiode: 2004-2006

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Bokprosjekt om norsk petroleumsforskning

...

Tildelt: kr 0,35 mill.

Prosjektperiode: 2004-2005

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Three-dimensional seismic angle migration and tomography

In this project we will associate the leading edge position of NTNU, represented by Bjørn Ursin, in the field of angle migration, with the high competence and experience of SINTEF with developing algorithms for 3D imaging in complicated geology In the f irst part of the project we plan to exten...

Tildelt: kr 1,4 mill.

Prosjektperiode: 2004-2007

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Geologic reservoir caracterisation. Alluvial deposits, controlling factors, processes, architectural style and hetrogeneities

The aim of the project is to understand the main factors controlling fluvial systems and their geometry in different sedimentary basins. The object is to develop models from outcrop studies that can be used as predictive tools in subsurface petroleum expl oration and production in fluvial reservo...

Tildelt: kr 3,7 mill.

Prosjektperiode: 2004-2008

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Petrophysical properties of mudstones and sandstones and their seismic response.

The aim of the project is to understand the main factors controlling the degree of sediment compaction (porosity loss) in sedimentary basins and the change in physical characteristics such as compressibility and seismic velocities. We will use data from m echanical experiments combined with wire ...

Tildelt: kr 3,6 mill.

Prosjektperiode: 2004-2008

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Integrated Information Platform for Reservoir and Subsea Production Systems

...

Tildelt: kr 8,5 mill.

Prosjektperiode: 2004-2008

Sted: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

Wireless Static Pressure Communication

...

Tildelt: kr 0,60 mill.

Prosjektperiode: 2004-2006

Sted: Rogaland

FRINAT-Matematikk og naturvitenskap

Uncertainty in Reservoir Evaluation - URE

To provide creative mathematically based solutions to recognized challenges in reservoir evaluation. This entails to identify, develop and evaluate methematically and physically based models for assessment of unsertainty in reservoir evaluation; and distr ibute information and provide training ab...

Tildelt: kr 3,3 mill.

Prosjektperiode: 2004-2010

Sted: Trøndelag - Trööndelage

DEMO2000-Prosj.ret tekn.utv. petro.virk

Borehole Seismic Source and Receiver system for Reservoir Description and IOR

...

Tildelt: kr 2,5 mill.

Prosjektperiode: 2004-2005

Sted: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

Pilot installation of the Wet Gas Compressor WGC2000 on a live gas field in the North Sea

...

Tildelt: kr 2,0 mill.

Prosjektperiode: 2004-2005

Sted: Vestland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Implementation and demonstration of new 3D-4C Ocean bottom seismic depth imaging technology

...

Tildelt: kr 4,0 mill.

Prosjektperiode: 2004-2005

Sted: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

Integrated SEMI/Steel Catenary Risers (SCR) in Deepwater & Harsh Environment Conditions

...

Tildelt: kr 2,0 mill.

Prosjektperiode: 2004-2005

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Multiscale Reservoir Simulation

In the conventional approach to reservoir simulation one starts with a fine-scale geomodel that may consist of several million grid blocks. This geomodel is then upscaled a few orders of magnitude so that it is possible to perform reservoir simulation. If more than one phase is present, upscalin...

Tildelt: kr 2,3 mill.

Prosjektperiode: 2004-2007

Sted: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

DeepBoosterTM System

...

Tildelt: kr 3,5 mill.

Prosjektperiode: 2004-2007

Sted: Ukjent Fylke

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Økt transportutnyttelse gjennom optimalisering av strømningskontroll og operasjonsstyring

...

Tildelt: kr 1,6 mill.

Prosjektperiode: 2004-2009

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Sanntids produksjonsoptimalisering

...

Tildelt: kr 2,3 mill.

Prosjektperiode: 2004-2008

Sted: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

Downhole gravity slip separator

...

Tildelt: kr 1,00 mill.

Prosjektperiode: 2004-2006

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Pålitelighetsfokusert forskning og kartlegging av potensielle feilårsaker og ekspert/datametodikk-utvikling for instrumenterte sikkerhetssys

Olje og gassvirksomheten til havs og på land setter stadig sterkere krav til ytelsesfaktorer som tilgjengelighet og pålitelighet for utstyr og operasjoner. Prosjektet er rettet mot forskningstema tilknyttet : 1) Instrumenteringspålitelighet 2) Pålitelige dypvannsoperasjoner. Det er i dag en mange...

Tildelt: kr 0,75 mill.

Prosjektperiode: 2004-2006

Sted: Rogaland

SIPOPETR-SIP-OED Petroleumssektoren

Effects of crude oil on the CO2 corrosion of carbon steel - Potensial for improved corrosion protection

...

Tildelt: kr 10,0 mill.

Prosjektperiode: 2004-2008

Sted: Akershus

SIPOPETR-SIP-OED Petroleumssektoren

GeoScale - Reservoir Simulation on a Geological Scale

...

Tildelt: kr 12,0 mill.

Prosjektperiode: 2004-2007

Sted: Oslo