0 antall prosjekter

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Risk Modelling, Integration of Organisational, Human and Technical factors

There is considerable knowledge about how human performance may help to prevent accidents in the general, qualitative sense. There is also qualitative knowledge about how human errors may contribute to causing accidents. But there is quite limited knowled ge about how the performance of organisat...

Tildelt: kr 7,8 mill.

Prosjektperiode: 2007-2011

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

SATURN Cold Flow demonstration project

...

Tildelt: kr 2,1 mill.

Prosjektperiode: 2007-2009

Sted: Trøndelag - Trööndelage

SFI-Sentre for forskningsdrevet innovasjon

Center for Integrated Operations in the Petroleum Industry

Senteret for Integrerte Operasjoner i Petroleumsindustrien (IO-senteret) har vært et Senter for Forskningsbasert Innovasjon (SFI) i perioden 2007-2015. Forskningspartnerne er NTNU (vertskap), SINTEF og IFE, 8 store olje- og gasselskap og 5 leverandørselskap er industripartnere og 7 internasjona...

Tildelt: kr 80,0 mill.

Prosjektperiode: 2007-2015

Sted: Trøndelag - Trööndelage

DEMO2000-Prosj.ret tekn.utv. petro.virk

ReelWell - Drilling Concept - Demonstration Jointed Pipe Version

...

Tildelt: kr 7,0 mill.

Prosjektperiode: 2007-2009

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

250T FRDS JIP Phase 3 & 4

...

Tildelt: kr 12,2 mill.

Prosjektperiode: 2007-2010

Sted: Møre og Romsdal

DEMO2000-Prosj.ret tekn.utv. petro.virk

Partitioning Interwell Tracer Test to measure oil saturation

...

Tildelt: kr 1,8 mill.

Prosjektperiode: 2007-2010

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Re-Os isotopic tracing of hydrocarbon systems in Arctic regions: Norway-USA collaboration implementing new technologies for exploration

Re-Os (rhenium-osmium) isotope geochemistry is emerging as a powerful tool for geochronology and tracer studies in petroleum systems. Both Re and Os are concentrated in organic material fixed in marine shales by reduction from seawater. The decay of 187 Re to 187Os provides a radiometric clock ...

Tildelt: kr 8,5 mill.

Prosjektperiode: 2007-2012

Sted: Trøndelag - Trööndelage

BIA-Brukerstyrt innovasjonsarena

TIME EFFECTS PILES UPGRADING BEARING CAPACITY OF PILED FOUNDATIONS TO ACCOUNT FOR TIME EFFECTS

The results of the project will primarily be based on the execution of a series of new pile load tests specifically designed to document the effects of time on the axial bearing capacity. A thorough characterisation of all relevant soil characteristics is necessary and will form an essential int...

Tildelt: kr 14,4 mill.

Prosjektperiode: 2007-2012

Sted: Oslo

TU-Tungt utstyr

"Time-Resolved 3D Particle Imaging Velocimetry" (TR-PIV) til til måling av hastighetsprofil og turbulensparametre i fluid dynamikk prosjekt

Det søkes om et forbedret laserbasert PIV ("Particle Imaging Velocimetry" - oppgradert til 3D-TR-PIV) system for hydrodynamisk relatert forskning ved UiS. Den økte tidsresponsen med TR-PIV sammenlignet med eldre langsom PIV, er nødvendig for å oppnå kval itetsdata i eksperimenter og numeriske si...

Tildelt: kr 2,4 mill.

Prosjektperiode: 2007-2008

Sted: Rogaland

FORNY-3-Kommersialisering av FoUresultater

Multi-anchored deformable rock bolt for rock reinforcement in mines, tunnels and for general engineering applications.

...

Tildelt: kr 0,65 mill.

Prosjektperiode: 2007-2008

Sted: Trøndelag - Trööndelage

DEMO2000-Prosj.ret tekn.utv. petro.virk

Real-Time Drilling Automated Analysis and Decision Support System

...

Tildelt: kr 1,9 mill.

Prosjektperiode: 2007-2009

Sted: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

Ship Based Production And Transportation Of Hlg (Heavy Liquified Gas)

...

Tildelt: kr 0,85 mill.

Prosjektperiode: 2007-2009

Sted: Akershus

SFI-Sentre for forskningsdrevet innovasjon

FACE - Multiphase Flow Assurance Innovation Centre

Flerfaseforskning i Norge strekker seg tilbake til 1980-tallet da utviklingen av felter som Ekofisk, Statfjord og Gullfaks ble igangsatt. Disse feltene stilte helt nye krav til kontroll på flyt av flerfase gass og væske i rørledningene og nye, lange trans portledninger med gass og kondensat ble i...

Tildelt: kr 80,0 mill.

Prosjektperiode: 2007-2015

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Collaborative Decision Making in Integrated Operations

The CODIO project proposes to create a new synthesis of previous work in integrated operations, decision support, and semantic technology in order to improve decision making processes in future well planning and execution. The central component of the CO DIO architecture is a Dynamic decision mo...

Tildelt: kr 9,1 mill.

Prosjektperiode: 2007-2010

Sted: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

Qualification of Subsea Hybrid Pump

...

Tildelt: kr 2,9 mill.

Prosjektperiode: 2007-2011

Sted: Akershus

FORNY-3-Kommersialisering av FoUresultater

Verification - New method for drilling and constructing extended horizontal wells for the production of hydrocarbons.

...

Tildelt: kr 1,2 mill.

Prosjektperiode: 2007-2008

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Smart mud system for mud handling and drill cuttings removal.

...

Tildelt: kr 2,5 mill.

Prosjektperiode: 2007-2010

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Verification of a directional seabed seismic source at Gjøa for shallow waterflow and shallow gas investigations

...

Tildelt: kr 1,5 mill.

Prosjektperiode: 2007-2008

Sted: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

Fiber Optic Reservoir Monitoring

...

Tildelt: kr 5,8 mill.

Prosjektperiode: 2007-2009

Sted: Vestland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Drilling Operations Tracking System for drill pipe life cycle management, supply chain-and drilling operations management

...

Tildelt: kr 6,3 mill.

Prosjektperiode: 2007-2011

Sted: Ukjent Fylke

DEMO2000-Prosj.ret tekn.utv. petro.virk

High Temperature Vessel Internal Electrostatic Coalescer with water profiling system

...

Tildelt: kr 2,9 mill.

Prosjektperiode: 2007-2008

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

ZipLog well logging system using fiber optic technology

...

Tildelt: kr 2,2 mill.

Prosjektperiode: 2007-2008

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

SubseaGasBoostingJIP

...

Tildelt: kr 66 734

Prosjektperiode: 2007-2007

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Development of Seabed Drilling Rig, Phase 1

...

Tildelt: kr 6,6 mill.

Prosjektperiode: 2007-2008

Sted: Rogaland

FORNY-3-Kommersialisering av FoUresultater

EcoWAT - Produced water treatment for oil&gas production

...

Tildelt: kr 2,0 mill.

Prosjektperiode: 2007-2008

Sted: Trøndelag - Trööndelage

FORNY-3-Kommersialisering av FoUresultater

ASIS - Advanced Seismic Imaging Software

...

Tildelt: kr 1,00 mill.

Prosjektperiode: 2007-2007

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Effekt av DPR (Disproportionate Permeability Reduction) i karbonatbergarter ved bruk av mGel emulsjon

Grunnlag:IOR Chemco har i samarbeid med Statoil, Total og IRIS utviklet en emulsjon for vannavstengning. Emulsjonen, mGel er utviklet på IRIS og pilottestet på Veslefrikk. Pilottesten var støttet av Innovasjon Norge(Kontraktnummer 2003/001054) Pilottesten viste at mGel reduserer vannproduksjonen...

Tildelt: kr 99 999

Prosjektperiode: 2007-2007

Sted: Ukjent Fylke

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Totalistic 4D Seismic Data Analysis for Quantitative Interpretation

...

Tildelt: kr 4,5 mill.

Prosjektperiode: 2007-2009

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

An Integrated Approach to Interfacial / Surface Processes in Crude Oil Systems

refer to Appendix I

Tildelt: kr 0,16 mill.

Prosjektperiode: 2007-2007

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

SMOOTHPIPE: Applied Surface Technology for Multiphase Pipelines

Pressure drop along the pipeline is the main obstacle to transportation of unprocessed or partly processed wellstream over long distances. Several parameters contribute to the pressure drop, e.g. liquid hold-up, precipitations, gas-liquid surface drag for ces and surface roughness. The project wi...

Tildelt: kr 7,2 mill.

Prosjektperiode: 2007-2010

Sted: Trøndelag - Trööndelage