0 antall prosjekter

NAERINGSPH-Nærings-phd

Safety Climate Assessment in Shipping (SAFE CLASS); Loss prevention through Psychological Capital assessment

Menneskelig svikt er den viktigste årsaken til de fleste maritime ulykker. Til tross for en rekke teknologiske nyvinninger i moderne shipping har antall ulykker ikke blitt vesentlig redusert. Pålitelige og velfungerende tekniske systemer er viktige, men ofte ikke tilstrekkelig til å unngå ulykker...

Tildelt: kr 0,79 mill.

Prosjektperiode: 2010-2015

Sted: Vestland

MAROFF-2-Maritim virksomhet og offsh-2

Safety Climate Assessment in Shipping (SAFECLASS) - Linking leadership, safety climate and loss prevention.

This project will contribute to Norwegian society and long term value creation by optimizing safety and loss prevention in the Norwegian maritime industry. Safe shipping and loss prevention emerge as an important priority for the next generation of mariti me training and development initiatives i...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2009-2010

Sted: Vestland

PETROMAKS2-Stort program petroleum

Developing and sustaining safety culture in the Norwegian petroleum industry: Leadership, Psychological Capital and Situational Awareness.

This aim of this project is to optimize HSE objectives in the Norwegian petroleum industry. Previous research from the IPRC on the petroleum industry on the UK Continental Shelf has indicated that health, safety climate, and HSE outcomes are substantially influenced by perceptions of the priorit...

Tildelt: kr 8,0 mill.

Prosjektperiode: 2009-2013

Sted: Vestland

INT-BILAT-BILAT-ordningen

USA - Operativ Psykologi: Kontaktmøter med samarbeidspartnere i USA med sikte på utarbeidelse av søknad for hovedprosjekt

Based on preliminary results from previous research at the U.S. Military Academy/ Norwegian Naval Academy and University of Bergen we propose to develop a new research collaboration between researchers at the University of beregn Norway and significant U. S. institutions involved in research and ...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2006-2007

Sted: Vestland