0 antall prosjekter

PES-EU-Prosjektetablererstøtte EU (bedrift)

Efficient system to enable storage of high temperature solar heat energy

...

Tildelt: kr 30 000

Prosjektperiode: 2010-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Plastic Industrial Containers Decontamination and Re-Use

...

Tildelt: kr 49 999

Prosjektperiode: 2010-2011

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

DockingMonitor - development of automated combined berthing aid and drift monitoring system for large ships

...

Tildelt: kr 30 000

Prosjektperiode: 2010-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

A Portable Friction Welding Machine for Fast Joining Small-Diameter Plastic Pipes

...

Tildelt: kr 30 000

Prosjektperiode: 2010-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Electrolytic cleaning of emulsified oil in waste waters from vessels (bilge), oil exploration (slop) and oily seepage from landfills and was

...

Tildelt: kr 30 000

Prosjektperiode: 2010-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Photocatalysis with UV LED Sources for Efficient Water Purification

...

Tildelt: kr 30 000

Prosjektperiode: 2010-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Offshore Monitoring System for Wind and Wave Power Technologies

...

Tildelt: kr 40 000

Prosjektperiode: 2010-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of a novel autonomous vehicle for subsea sensors deployment and recovery - AutoDrop

...

Tildelt: kr 19 999

Prosjektperiode: 2009-2010

Sted: Akershus

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of new techniques in hatchery rearing for Nephrops

...

Tildelt: kr 29 999

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

High performance MH hydrogen storage tank

...

Tildelt: kr 24 999

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development, construction, scientific testing and verification of a high speed and high precision water cutting Down Hole Scale Removal Conc

...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2009-2010

Sted: Rogaland

PES-EU-Prosjektetablererstøtte EU (bedrift)

Nutritional and shelf stable milk by novel microwave processing

...

Tildelt: kr 79 999

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

The development of a deammonification treatment to remove nitrogen from recirculated water used in aquaculture

...

Tildelt: kr 0,13 mill.

Prosjektperiode: 2009-2011

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Electro-agglomeration of Engineered NanoParticles out of process and waste water to minimise the Health and Safety Risks in Coating Applicat

...

Tildelt: kr 29 999

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of Innovative mooring systems including new anchoring technology and monitoring system for sea-based fish farming

...

Tildelt: kr 0,18 mill.

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of sustainable and cost effective water quality management technology for the aquaculture industry

...

Tildelt: kr 0,22 mill.

Prosjektperiode: 2009-2012

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of an innovative automated and wireless trap with warning and monitoring modules for integrated management of the Mediterranean

...

Tildelt: kr 29 999

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of an energy efficient treatment for hydrocarbon-rich industrial waste fluid by evaporation and oxidation to enable closed -loop

...

Tildelt: kr 59 999

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of a sustainable and cost effective ballast water treatment technology with reverse pulsed DC electric field that excludes forma

...

Tildelt: kr 0,19 mill.

Prosjektperiode: 2009-2011

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Fire resistance rated ventilation on ships and offshore installations

...

Tildelt: kr 29 999

Prosjektperiode: 2009-2010

Sted: Trøndelag - Trööndelage

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of system for semi-continuous monitoring of salinity in well streams to remove volume measurement errors and detect water break

...

Tildelt: kr 0,17 mill.

Prosjektperiode: 2009-2011

Sted: Akershus

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of a hygienic polyethylene coating for the protection of refrigerated Sea-water (RSW) tanks on fishing vessels that prolong lif

...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

ShipGlider

...

Tildelt: kr 79 999

Prosjektperiode: 2009-2010

Sted: Akershus

PES-EU-Prosjektetablererstøtte EU (bedrift)

Small scale low temperature Solar Thermal Power Cogenerating System for buildings with large roof surface - Stirling Heat Engine and Non Con

...

Tildelt: kr 49 999

Prosjektperiode: 2009-2010

Sted: Akershus

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of novel system for continuous remote monitoring of weight, growth, and size distribution of fish in aquaculture enclosures

...

Tildelt: kr 0,24 mill.

Prosjektperiode: 2009-2011

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of a cost effective sea cage net with increased strength, abrasion resistance and fouling resistance

...

Tildelt: kr 0,18 mill.

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of methods and technology for sea ranching and stock enhancement of lobster, including development for pre-conditioning, selecti

...

Tildelt: kr 99 999

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of new techniques in hatchery rearing, fishery enhancement and aquaculture for - NEPHROPS

...

Tildelt: kr 49 999

Prosjektperiode: 2009-2009

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Smart and Flexible Automatic Assembling Machinery

...

Tildelt: kr 49 999

Prosjektperiode: 2009-2009

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Life-Saving, wearable system based on innovative gas sensors technology with carbon nanotubes.

...

Tildelt: kr 39 999

Prosjektperiode: 2009-2009

Sted: Oslo