0 antall prosjekter

HAVBRUKS-Havbruk - en næring i vekst

Resistance towards pyrethroids and emamectin in sea lice

Ectoparasitic copepods represents a critical economical and health related threat to the salmonid aquaculture industry, as well as to wild salmonids. The primary method of control is delousing infected fish with pyrethroids and avermectins. Resistance tow ards chemotherapeutants has been demonstr...

Tildelt: kr 5,2 mill.

Prosjektperiode: 2008-2011

Sted: Oslo

IS-STP-Statsstipendprogram, utlendinger

Stepan, Jiri Tsjekkia STP0708

...

Tildelt: kr 30 000

Prosjektperiode: 2008-2008

Sted: Oslo

NORKLIMA-Klimaendringer og konsekvenser for Norge

Modelling ecosystems under climate change: Windermere as a model lake system

Climate profoundly affects ecosystem functioning, as well as human populations inhabiting and exploiting ecosystems. Hence, climate change is likely to have serious ecological, economic and societal consequences that it is urgent to investigate. Here we p ropose to develop a complete matrix commu...

Tildelt: kr 5,3 mill.

Prosjektperiode: 2008-2012

Sted: Oslo

TJENESTER-Helse- og omsorgstjenester

Integrated care for chronic conditions: a multi-method controlled evaluation

The Central Norway Regional Health Authority (Helse Midt-Norge RHF) is to develop a structured collaboration between community and specialist care for people with chronic conditions. As an important part of this the patients will be mobilised by training and education to become more independent a...

Tildelt: kr 4,0 mill.

Prosjektperiode: 2008-2013

Sted: Trøndelag - Trööndelage

NORKLIMA-Klimaendringer og konsekvenser for Norge

Climate change adaptation in Norway, sweden and Finland - do research, policy and practice meet?

...

Tildelt: kr 93 695

Prosjektperiode: 2008-2009

Sted: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

Development and qualification of technical solutions for an electrically controlled subsea x-mas tree

...

Tildelt: kr 13,6 mill.

Prosjektperiode: 2008-2010

Sted: Buskerud

FINANSMARK-Finansmarkedet

Stability of Financial Markets: An Evolutionary Approach

This project is concerned with the stability and dynamics of financial markets. How to reduce or eliminate the latent risk of a period of market instability (such as a crash) is a topic of an ongoing debate among politicians, regulators and practitioners, as witnessed, for instance, by the curre...

Tildelt: kr 1,3 mill.

Prosjektperiode: 2008-2010

Sted: Vestland

SYNKNØYT-Progr.f.synkrotron- og nøytron

Novel materials for hydrogen storage studied by synchrotron X-ray diffraction

One major unsolved problem for the introduction of hydrogen into the global energy system is effective storage of hydrogen. This proposal addresses novel materials for hydrogen storage and in particular aluminium-, magnesium- and boron-based metal hydride s. Materials with hydrogen contents highe...

Tildelt: kr 2,6 mill.

Prosjektperiode: 2008-2013

Sted: Akershus

SMARTRANS-Næringslivets transp. og ITS

EFFEKT - Effektiv distribusjon av medieprodukter ved avanserte verktøy for ruteplanlegging og revisjon

I distribusjon av medieprodukter er ruteplanlegging, -revisjon og transportstyring svært komplekse og omfattende oppgaver. Ruteplanene omfatter gjerne titusener av leveringssteder, tilsvarende alle husstander i området. De må koordineres med planer for tr ykking og pakking. Effektivitet, fleksibi...

Tildelt: kr 5,9 mill.

Prosjektperiode: 2008-2011

Sted: Oslo

MILJØ2015-Norsk miljøforskning mot 2015

VANN: Management of wild Atlantic salmon and escaped farmed salmon: Economic drivers, impacts and conflicts. (Other rel. subject: Samfunn)

Escaped farmed salmon has a number of well-known negative biological effects on the wild Atlantic salmon stock (Salmo salar), but also some potential positive effects as it may increase the salmon stock available for both marine and recreational fishing. The aim of this project is to analyse such...

Tildelt: kr 3,0 mill.

Prosjektperiode: 2008-2011

Sted: Trøndelag - Trööndelage

YFF-Yngre, fremragende forskere

The Function of Cyclin Dependent Kinases in the DNA Damage Response and Maintenance of Genome Stability

Project Summary Genome instability is one of the hallmarks of cancer. However, the mechanisms that protect the genome against spontaneous gross chromosomal rearrangements (GCRs) are not well understood. In recent years several pathways have been identifi ed that protect the genome against sponta...

Tildelt: kr 9,5 mill.

Prosjektperiode: 2008-2012

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Research Training Network on ICT-enabled Planning and Decision-making in Manufacturing Networks

...

Tildelt: kr 0,21 mill.

Prosjektperiode: 2008-2008

Sted: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

One click cabin furnishing

Prosjektet vil bli todelt: 1. Utvikling av en helt ny modulær møbelserie for skip og olje rigger etc. 2. Utvikling av et helt nytt IKT-system. Hensikten med å utvikle en helt ny møbel serie er: a) Gjøre produksjon av møbler helt mod ulær b) Redusere antall komponenter ...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2008-2008

Sted: Vestland

PES-EØS-Prosjektetablererstøtte EØS-området

eea-søknad: Postfire Ecosystem Recovery in Burned Forests and Rangelands after the Destructive Wildfires in South Greece

...

Tildelt: kr 22 987

Prosjektperiode: 2008-2009

Sted: Trøndelag - Trööndelage

BIONÆR-Bionæringsprogram

Role of marine food to fight metabolic syndrome: evaluating the benefits and risks

Although marine food has long been known to have health properties, its roles and impacts on insulin sensitivity and metabolic diseases (e.g. type 2 diabetes, obesity, hypertension, coronary heart diseases etc.) remain still unclear and worldwide debated. Beside its potential health effects, rec...

Tildelt: kr 3,9 mill.

Prosjektperiode: 2008-2012

Sted: Vestland

SAM-EU-Samfinansiering EU-kontoret

Driving under Influence of Drugs, Alcohol and Medicines

...

Tildelt: kr 1,3 mill.

Prosjektperiode: 2008-2014

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Concept for European working environment and public health

...

Tildelt: kr 0,18 mill.

Prosjektperiode: 2008-2008

Sted: Oslo

PES-EØS-Prosjektetablererstøtte EØS-området

DEVELOPING A SOFTWARE THAT WOULD ALLOW MAXIMUM PROTECTION OF THE WATERSHEDS FROM HIGHWAY RUNOFF

...

Tildelt: kr 31 000

Prosjektperiode: 2008-2008

Sted: Akershus

PES-EØS-Prosjektetablererstøtte EØS-området

EFFICIENT MONITORING SYSTEM FOR HEALTHY ENVIRONMENT (EMOSHEN)

...

Tildelt: kr 7 000

Prosjektperiode: 2008-2008

Sted: Akershus

PES-INST-Prosjektetablererstøtte EU (FoU)

Smart system for Anti-icing/De-icing Anti-contamination to improve aircraft performance and safety

...

Tildelt: kr 63 652

Prosjektperiode: 2008-2008

Sted: Oslo

PES-EUR-Prosjektetablererstøtte Eureka

Investigation and further development of a delivery system suitable for delivery of siRNAsenses siRNA based drugs

...

Tildelt: kr 0,10 mill.

Prosjektperiode: 2008-2008

Sted: Oslo

EUPROSJEKT-Forskningsrådets EUprosjekt

Stip. Håkon Ursin Steen. Delt i 7RP-finansiert prosj om teknologistandardisering. 189692/S20

...

Tildelt: kr 0,11 mill.

Prosjektperiode: 2008-2010

Sted: Ukjent Fylke

PES-EUR-Prosjektetablererstøtte Eureka

SMARTVALVE EUREKA INTEGRATION

...

Tildelt: kr 0,10 mill.

Prosjektperiode: 2008-2009

Sted: Innlandet

KLINISK-Klinisk forskning

Diskusjonsmøte NAKKOF (Nasjonalt kompetansesenter for klinisk odontologisk forskning)

...

Tildelt: kr 7 714

Prosjektperiode: 2008-2008

Sted: Oslo

PES-EØS-Prosjektetablererstøtte EØS-området

DEVELOPMENT OF AN INTEGRATED SYSTEM FOR BIOTREATMENT AND RECYCLING OF OLIVE MILL WASTEWATERS

...

Tildelt: kr 35 000

Prosjektperiode: 2008-2008

Sted: Akershus

PES-INST-Prosjektetablererstøtte EU (FoU)

Sustainability and Performance Assessment of Buildings

...

Tildelt: kr 59 999

Prosjektperiode: 2008-2009

Sted: Trøndelag - Trööndelage

PES-EØS-Prosjektetablererstøtte EØS-området

USE OF ON-SITE WASTEWATER TREATMENT SYSTEMS FOR REMOVAL OF ENDOCRINE DISRUPTING COMPOUNDS IN WASTEWATER AND SAFE REUSE OF TREATED WASTEWATER

...

Tildelt: kr 37 000

Prosjektperiode: 2008-2008

Sted: Akershus

PES-INST-Prosjektetablererstøtte EU (FoU)

Reducing Emissions from Aviation by Changing Trajectories for the benefit of Climate

...

Tildelt: kr 54 999

Prosjektperiode: 2008-2008

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Arctic standards

In cooperation with Petromaks develop projects on Russian Environmental Standards. Russia has over many years developed "Maximum Permissible Levels" (MPL)for a number of contaminants, chemical and physical topics in water, soil and biota. These standards are base for their national environmental ...

Tildelt: kr 99 999

Prosjektperiode: 2008-2009

Sted: Troms - Romsa - Tromssa

FRIBIO-Biologi og biomedisin

Regulation of Autophagy through two Big Protein Complexes; TORC1 and class 3 PI3K

The mammalian target of rapamycin (mTOR), a master regulator of both growth and catabolic processes, plays a central role in signal transduction pathways mediated by a variety of stress factors. Consequently, dysregulation of mTOR is found in many cancers . Recently, much attention has been focus...

Tildelt: kr 1,00 mill.

Prosjektperiode: 2008-2009

Sted: Oslo