0 antall prosjekter

MAROFF-2-Maritim virksomhet og offsh-2

Construction and intervention vessels for Arctic oil and gas operations

...expected increased oil and gas activities in cold climate...require dedicated designs for future Arctic offshore vessels. Specification, design and...dedicated vessels should be of major interest for oil and gas companies posit ioning themselves...

Tildelt: kr 6,7 mill.

Prosjektperiode: 2008-2011

Sted: Trøndelag - Trööndelage

PES-HORISONT-EU-PES Horisont Europa

Digital twin for Hydro Power Plants

...framework to build a research-driven digital twin for existing hydro power plants...based on recent funded projects VICINITY (RIA), GIFT (IA), AURORAL (IA) and SPADE...technologies (Research/Academia) • Weather data and forecasts • Copernicus and other data...

Tildelt: kr 69 999

Prosjektperiode: 2022-2023

Sted: Telemark

PETROMAKS2-Stort program petroleum

PeTWIN : Whole-field digital twins for production optimization and management

...Digital twins are necessary for the successful...research agenda to (1) work with existing industry initiatives in digital twins for...the methods needed to create a next generation of scalable, maintainable and useful digital...Digitale tvillinger er nødvendige for...

Tildelt: kr 8,0 mill.

Prosjektperiode: 2020-2024

Sted: Oslo

NANO2021-Nanoteknologi og nye materiale

Next Generation Umbilicals for Electrification of Offshore Installations

...For Norway and other oil&gas producing countries...emissions related to exploration and production of petroleum products is increasingly focused. For...environmental organizations. One important part of the challenge reaching these goals is related...

Tildelt: kr 2,6 mill.

Prosjektperiode: 2013-2016

Sted: Akershus

SFI-Sentre for forskningsdrevet innovasjon

Marine Operations Center (MOVE)

...Marine Operations Centre will develop knowledge,...for safe, robust and efficient installation of structures and maintenance of equipment in...methods are targeted to open new possibilities for Norwegian industry and the stakeholders in the...for SFI MOVE er å bidra til kostnadseffektive...

Tildelt: kr 92,1 mill.

Prosjektperiode: 2015-2024

Sted: Møre og Romsdal

PES2020-Prosj.etabl.støtte H2020

Autonomous Wireless Leak Detection

...goal of the project is to develop, test and qualify a...Wireless Leak Detection targeted at the oil and gas industry. The final solution will be...in remote locations - Autonomous operation in time periods - Efficient sensor data...

Tildelt: kr 39 999

Prosjektperiode: 2014-2015

Sted: Trøndelag - Trööndelage

PETROMAKS2-Stort program petroleum

Improved lifetime estimation of mooring chains

...failure of one or several mooring lines on a floating...unit (FPU) can have devastating environmental and economic consequences. Mooring chain failures...Shelf (NCS). This is primarily due to a lack of knowledge on how to assess the state of mooring...

Tildelt: kr 15,0 mill.

Prosjektperiode: 2018-2022

Sted: Trøndelag - Trööndelage

PETROMAKS2-Stort program petroleum

Digital Well Internvention

...underlying idea of the development of the Digital Well...is to reduce the cost and energy consumption of well intervention operations while improving...solution. This will in turn increase production and value creation. The platform is to ensure that...

Tildelt: kr 15,0 mill.

Prosjektperiode: 2020-2022

Sted: Rogaland

PETROMAKS2-Stort program petroleum

Electrification of Oil and Gas Installation by Offshore Wind

...Oil and gas (O&G) extraction facilities on the...shelf (NCS) are the second largest source of greenhouse gas emissions in Norway after...are responsible for approximately 27% of the total emission in Norway. Gas turbines are...

Tildelt: kr 12,8 mill.

Prosjektperiode: 2020-2023

Sted: Akershus

PES-HORISONT-EU-PES Horisont Europa

nov El - energy - re C ycling - s O lution - to - i M prove - onbo AR d - eff I ciancy - of - pmfc - for - waterbour N e - op E rations

...aim is to recover and recycle waste energy of proton exchange...The ultimate goal is to improve the efficiency of PEMFC power system by at least 20% through CHP...The energy will be recovered by a combination of strategies, such as: recovering waste heat...

Tildelt: kr 0,12 mill.

Prosjektperiode: 2021-2021

Sted: Nordland - Nordlánnda

NAERINGSPH-Nærings-phd

Digital transformation in the offshore E&P supply chain operations

...Norwegian oil and gas industry has an engineering-oriented...pursued towards subsea systems, exploration, and drilling efficiency in operations subjected to...At the same time, the operation’s supply chain support kept adapting to what was needed from...

Tildelt: kr 1,6 mill.

Prosjektperiode: 2018-2021

Sted: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

INTEGRATED TOTAL QUALITY MANAGEMENT IN OFFSHORE SHIPPING COMPANIES

...In this project we emphasize the development of a...contributing to strategic entrepreneurship of offshore shipping companies. This includes the...systems for new comp lex products in arctic operations. We focus on the role of the total quality...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2008-2010

Sted: Troms - Romsa - Tromssa

PETROMAKS2-Stort program petroleum

Fire Simulation for Understanding and Prevention of Major Accidents

...fires are especially feared events in the oil and gas industry. Accidents happen with...lost, facilities destroyed, environments contaminated, economics endangered and the credibility...occur as a result of escalation of one event into new events with escalating risk of damage....

Tildelt: kr 5,0 mill.

Prosjektperiode: 2014-2016

Sted: Trøndelag - Trööndelage

PETROMAKS2-Stort program petroleum

Lifetime prediction of polymer-, elastomer and composite materials for sub sea application in arctic and deep water regions

...production of oil and gas is happening under ever tougher...combination of high loads, high temperatures and corrosive environment (oil, chemicals) with...on reliability for offshore oil production in arctic and de ep water regions requires a...

Tildelt: kr 12,5 mill.

Prosjektperiode: 2009-2015

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Enabling production of remote gas

...main focus in project is to address the critical...related to floating production of natural gas from smaller fields through a coordinated...Specific challenges are: Safety, movement of pro cess equipment, weight and compactness as...

Tildelt: kr 27,5 mill.

Prosjektperiode: 2005-2009

Sted: Trøndelag - Trööndelage

PES2020-Prosj.etabl.støtte H2020

Offshore oil and gas exploration by DNA-biomarkers, seismic data and ocean-bottom nodes deployed in swarms

...Eurostars proposal will develop, test and qualify novel hydrocarbon exploration methods...achieved by combining new efficient drop nodes for seismic data acquisition with seabed sampling...These new methods will be based on the combined results of Dutch and Norwegian EU-H2020...

Tildelt: kr 99 999

Prosjektperiode: 2020-2020

Sted: Akershus

PETROMAKS2-Stort program petroleum

Accurate multiphase flow predictions for long tiebacks and subsea developments

...tiebacks will be a key technology for the resources to be developed in the future in...(a) Make economically viable marginal or small oil and gas developments (b) Extend the life of...project represents a step change in the design of safe and cost-efficient tiebacks and...

Tildelt: kr 5,0 mill.

Prosjektperiode: 2018-2020

Sted: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

MAROFF Forprosjekt: Lynx maritime applications

...there are around 50,000 vessels sailing the seven seas that altogether consume about...of heavy fuel oil a year. The sulfur content in the exhaust gases of ships should be reduced...present to 0.5 percent by th e year 2020 according to the International Maritime Organization...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2014-2014

Sted: Trøndelag - Trööndelage

MAROFF-2-Maritim virksomhet og offsh-2

Arctic offshore logistics

...oil and gas (O&G) activities are moving north in...arisen. These challenges will impose more stringent requirements for the logistics system,...drive the cost and environmental impact of offshore logistics. Copying the logistics system and...

Tildelt: kr 8,6 mill.

Prosjektperiode: 2015-2017

Sted: Rogaland

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

CO2 Interface Transport Interface Storage

...Capture and Storage (CCS) technology requires methods for...captured carbon dioxide to a storage facility. In most cases this will involve pipeline transport...CO2, generally across long distances. In design of CCS, CO2 transport is the necessary link...

Tildelt: kr 16,7 mill.

Prosjektperiode: 2008-2013

Sted: Rogaland

NAERINGSPH-Nærings-phd

Capture and Reuse of Engineering Knowledge in Digital Twins

...Aerospace and Defense industry addresses today configuration...of product data and their sharing by frameworks for data management and for data interoperability....all product related data or references to them in one location. This leads to a comprehensive and...

Tildelt: kr 2,2 mill.

Prosjektperiode: 2016-2020

Sted: Oslo

PETROMAKS2-Stort program petroleum

The Norwegian oil and gas supply industry in hard times: Innovation in global supply chains.

...project GLOBOIL studies how Norwegian upstream oil and gas...and innovative capabilities to the demands of recent development in global manufacturing....to Norway's abilities to facilitate the optimal use of its own resources, as well as...GLOBOIL har studert hvordan norske oppstrøms olje- og...

Tildelt: kr 13,2 mill.

Prosjektperiode: 2018-2023

Sted: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

PREPROJECT:INCREASING OPERATION TIME BY PRE- SIMULATIONS OF OFFSHORE CRANE OPERATIONS

...in cooperation with Sintef ICT arranged a ?VRI...with the title «More efficient Maritime operationin Haugesund the 6th of June. All the...from the Maritime Industry in Rogaland were present. Th e most important need both...

Tildelt: kr 0,13 mill.

Prosjektperiode: 2014-2014

Sted: Agder

MAROFF-2-Maritim virksomhet og offsh-2

RORO (Riser Opereration Replacement Optimisation)

...risers are critical components for nearly all offshore floating oil and gas...have to be replaced when needed. Replacement intervals depend on environment, loading, fluid...or mechanical wear & tear, temperature, design life. Flexible risers are replaced or added...

Tildelt: kr 4,5 mill.

Prosjektperiode: 2018-2020

Sted: Møre og Romsdal

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Reducing the Environmental Impact of Acid Gas Cleaning Technology

...gas removal denotes the capture of CO2 and H2S...gas processing, and an absolute requirement before pipeline transport of the gas, where,...be exceeded. If the gas is further processed in an LNG-plant, the limits are typically 100 ppm...

Tildelt: kr 7,1 mill.

Prosjektperiode: 2006-2010

Sted: Trøndelag - Trööndelage

FMETEKN-FME - teknologi

Norwegian Research Centre on Wind Energy

...NorthWind, the Norwegian Research Centre on Wind Energy,...to facilitate the sustainable development of wind power with respect for nature both on land...the creation of thousands of new green jobs in the Norwegian service and supply industry and...

Tildelt: kr 120,0 mill.

Prosjektperiode: 2021-2029

Sted: Trøndelag - Trööndelage

BIA-Brukerstyrt innovasjonsarena

Bridging the gap – information management platforms across the lifecycle of buildings

...the project aim to examine the development of digital twins from the...and construction, WP1 takes a starting point of examining barriers, possibilities and benefits...possibilities and benefits in the context of the reference project(s). WP2 will go deeper in...

Tildelt: kr 9,7 mill.

Prosjektperiode: 2021-2025

Sted: Trøndelag - Trööndelage

IS-TOPP-Toppfinans. av M.Curie-stipend

System modelling and analysis of wave energy converters

...major contributor to the Renewable Energy Mix in Europe and elsewhere. The technology for...development stage. Experiences show that moor ing system design is a fundamental issue for the...damage tolerance or at least survival of temporary p eriods involving replacement of...

Tildelt: kr 0,25 mill.

Prosjektperiode: 2009-2010

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Digital Twin Yard (DTYard) - An ecosystem for maritime models and digital twin simulation

...grand vision of the innovation is to establish a...industry ecosystem for digital twin systems and vessels. The proposed ecosystem will...and effective construction of digital twin vessels (or virtual ships) in a collaborative...

Tildelt: kr 11,3 mill.

Prosjektperiode: 2019-2022

Sted: Akershus

ENERGIX-Stort program energi

High voltage subsea connections for resilient renewable offshore grids

...and Europe are currently faced with high energy...Europe is anticipated to have 32% (640 GW) of the global offshore wind capacity by 2050, much...of offshore (subsea) power transmission infrastructure to reliably transport the energy to...For å utnytte norske havområder til produksjon av...

Tildelt: kr 12,0 mill.

Prosjektperiode: 2023-2027

Sted: Trøndelag - Trööndelage