0 antall prosjekter

IS-BILAT-Mobilitet Norge-USA /Canada

Joint research on forging and extrusion of aluminum alloys, including physical and numerical modeling

Visiting professor and applicant have cooperated on metal forming research for some time. This work has lead to results that are currently close to a level where they can be published. A three-months visit of professor Misiolek to NTNU in Trondheim is req uired to finalise work. Work to be publis...

Tildelt: kr 85 000

Prosjektperiode: 2005-2006

Sted: Trøndelag - Trööndelage

INT-BILAT-BILAT-ordningen

Japanese-Norwegian collaboration on the past environmental conditions of the Arctic Ocean within the framework of the IODP

During august 2004 IODP´s The Arctic Drilling Expedition 2004 (ACEX) drilled four closely spaced sites (M0001-M0004) on the 450 m thick acoustically stratified sediment sequence draping the crest of the Lomonosov Ridge between 87°N and 88°N. The main purp ose of the expedition was to retrieve a c...

Tildelt: kr 0,35 mill.

Prosjektperiode: 2005-2007

Sted: Troms - Romsa - Tromssa

INTSAMGEN-Internasjonalt samarbeid generelt

Efficient port terminal operations

Port terminal operations are crucial for the competitiveness for maritime transport. However what are the characteristics of efficient port terminal handling? The increased transport demand internationally is one driver in the development towards e.g. lar ger vessels and bigger lot-sizes. Larger ...

Tildelt: kr 0,10 mill.

Prosjektperiode: 2005-2005

Sted: Trøndelag - Trööndelage

INTSAMGEN-Internasjonalt samarbeid generelt

Geophysics for investigation and analyses of large landslides

Rock avalanches and related tsunamis represent one of the most serious natural hazards in Norway, and during the last 100 years more than 170 people have lost their lives in western Norway. The Tafjord disaster of 1934 is one major example, where 3 millio ns m3 rock mass dropped into the fjord. T...

Tildelt: kr 0,10 mill.

Prosjektperiode: 2005-2005

Sted: Akershus

INT-BILAT-BILAT-ordningen

USA - Conditional inactivation of FIBP in mice

The principal goal of this study is to elucidate the function of FIBP and biological significance of the interactions between FIBP and acidic fibroblast growth factor that we demonstrated in vivo and in vitro. We plan to apply tissue-specific gene inactiv ation approach, which may provide valuabl...

Tildelt: kr 0,30 mill.

Prosjektperiode: 2005-2007

Sted: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

Qualification of Compact Tubular Coalescer (CTC)

...

Tildelt: kr 1,2 mill.

Prosjektperiode: 2005-2007

Sted: Akershus

PSYKISK-Psykisk helse

The causes and implementation of resilience

R.BUP's tasks are research and education to promote mental health in children and adolescents, with catchment area Eastern and Southern Norway. Activities focusing on resiliemce and coping have run for years. Examples are studies as: exploration of stress and resilience processess; longitudinal ...

Tildelt: kr 12,5 mill.

Prosjektperiode: 2005-2010

Sted: Oslo

NETT-Stimulerings-/nettverksbygging

IIASA YSSP - stipend - Fordelingsvirkninger av Kyoto-avtalen

...

Tildelt: kr 35 000

Prosjektperiode: 2005-2005

Sted: Ukjent Fylke

IS-RURE-EONR-rettsvitenskap

Giessen, Reinhard, EONR, rett, 05

...

Tildelt: kr 7 500

Prosjektperiode: 2005-2005

Sted: Ukjent Fylke

DIV-INT-Annet internasjonalt samarbeid

Internasjonalt seminar "4th International Veterinary Vaccines and Diagnostics Conference, 25. - 30. june 2006"

...

Tildelt: kr 0,10 mill.

Prosjektperiode: 2005-2006

Sted: Oslo

LANDSKAP-Landskap i endring. Bruk og forvaltning

Støtte til seminaret "The outback in focus"

...

Tildelt: kr 21 515

Prosjektperiode: 2005-2006

Sted: Innlandet

SKOGEN-Skog-ressurser og verdiskaping

Støtte til den 37. IRG konferansen, 18.-21. juni 2006

...

Tildelt: kr 50 000

Prosjektperiode: 2005-2006

Sted: Akershus

MILJØ2015-Norsk miljøforskning mot 2015

LAND: Støtte til konferansen "Forskning i friluft 2005"

...

Tildelt: kr 24 999

Prosjektperiode: 2005-2008

Sted: Oslo

HAVBRUKS-Havbruk - en næring i vekst

Marine wax esters as feed source for farmed fish.

The increase in carnivorous aquaculture is exhausting the world supplies of fish oils and new lipid sources are required. Vegetable oils can be used, but the fatty acids in salmon flesh in particular will change to a "plant" like composition with low cont ents of the marine fatty acids EPA/DHA. T...

Tildelt: kr 3,3 mill.

Prosjektperiode: 2005-2009

Sted: Vestland

HAVBRUKS-Havbruk - en næring i vekst

Neuroendocrine and environmental control of puberty in fish

Early sexual maturation leads to a significant loss of body weight during the spawning season, and farmed Atlantic cod (Gadus morhua) of both sexes currently reach puberty as early as two years of age, before reaching commercial size. Photoperiod treatmen t has been the most efficient strategy to...

Tildelt: kr 3,0 mill.

Prosjektperiode: 2005-2009

Sted: Oslo

TRE-FoU-programmet TRE

Utenlandsopphold for Ole Martin Bollandsås ved University of Wisconsin, USA.

Utenlandsoppholdet som søkes finansiert er knyttet til NFR-prosjektet "Utvikling av forvaltningsmodell for fleraldret skog - et doktorgradsprosjekt", prosjekt nr. 153185/110. Det finnes i dag ingen forvaltningsmodell for uensaldret skog i Norge. Med det økte fokus på bevaring av biologisk mangfo...

Tildelt: kr 49 999

Prosjektperiode: 2005-2007

Sted: Akershus

HAVBRUKS-Havbruk - en næring i vekst

Effects of environmental and nutritional stress on gene regulation in the Atlantic cod Gadus morhua.

The main goal of this project is to develop a microarray platform for gene regulation studies in the Atlantic cod. Stress genes in cod exposed to waterborne pollutants and dietary undesirables and supplements, will be sequenced as expressed sequence tags (ESTs), and a cDNA microarray will be cons...

Tildelt: kr 2,7 mill.

Prosjektperiode: 2005-2009

Sted: Vestland

MOBI-Mobilisering

Delprosjekt - Etablering av kompetanseplattformen Østfoldportalen

HiØ har siden 1994 hatt Innovasjon og virksomhetsutvikling som satsningsområde.Dette er fulgt opp i strategiske handlingsplaner og dokumenter og senest i Strategisk Plan for HiØ2004-07 (vedtatt 21.06.04).I peroden november 2003 til mars 2004 ble det utf ørt et samarbeidsprosjekt mellom avdeling...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2005-2006

Sted: Østfold

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Tools for studying hydrate slurry transport in hydrocarbon transport lines - principally gas-condensate lines

Good mathematical models for the physico-chemical processes that govern the critical flow assurance aspects of direct well stream production are important for e-field operations as well as for the initial design. Such models are today inaccurate and immat ure or in some cases non-existent. This p...

Tildelt: kr 8,6 mill.

Prosjektperiode: 2005-2008

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Developing exploration tools: Microstructural controls on magnetic minerals and magnetic anomalies on the Norwegian continental margin

Geomagnetic field research is in a period of unprecedented opportunity, with the Oersted, Champ, SAC-C Earth satellites, and the new SWARM mission recently approved by ESA. Advances in technology and instrumentation have provided the scientific community with a vast amount of high-quality data fr...

Tildelt: kr 2,7 mill.

Prosjektperiode: 2005-2009

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Right time integration and use of production data in reservoir characterization and sweep analysis to maximize the reservoir performance

...

Tildelt: kr 4,1 mill.

Prosjektperiode: 2005-2008

Sted: Akershus

IS-BILAT-Mobilitet Norge-USA /Canada

Cognitive and neuroendocrine correlates of stress coping style in fish

The project is integrated with a joint effort between the applicant Dr. Øyvind Øverli and Professor Cliff Summers at the University of South Dakota, who has recently submitted a project application to the National Science Foundation entitled "Effects of s election for stress responsiveness on cog...

Tildelt: kr 0,16 mill.

Prosjektperiode: 2005-2006

Sted: Akershus

INTSAMGEN-Internasjonalt samarbeid generelt

CO2 sequestration by mineralization

A method for CO2 sequestration gaining increased attention from the international scientific community, is carbonation of silicate minerals to form stable carbonates and silica products. Mafic silicates have especially shown good potential for CO2 sequest ration. IFE is in the beginning of a 4-ye...

Tildelt: kr 0,10 mill.

Prosjektperiode: 2005-2005

Sted: Akershus

INTSAMGEN-Internasjonalt samarbeid generelt

Multimedia Metadata Exchange

The purpose of MSMDX is to create web-native infrastructure and tools for utilizing multimedia information. Users will be able to author, annotate, re-edit and re-use image, audio and video content in a networked, collaborative fashion. Key user groups in clude fan communities (of movies, TV show...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2005-2005

Sted: Trøndelag - Trööndelage

INT-BILAT-BILAT-ordningen

Frankrike - Sustainable tourist development (sport fishing) in Golfo Dulce, Costa Rica

Sport fishing has been a tourist activity in Golfo Dulce, Costa Rica, attracting both national as well as international tourists. Business in sport fishing has grown rapidly and contributes greatly to the economic development of the region. In general the local communities who work in tourist in...

Tildelt: kr 0,10 mill.

Prosjektperiode: 2005-2007

Sted: Oslo

INT-BILAT-BILAT-ordningen

Kina - Membrane reactor for bio-hydrogen production (project initiation)

The increasing awareness of adverse effects of climate gasses has resulted in the search for more efficient and new technologies that minimize emissions. Biomass as fuel is regarded as neutral in respect to climate gas emission and can therefore be an alt ernative to non-renewable polluting fossi...

Tildelt: kr 0,50 mill.

Prosjektperiode: 2005-2008

Sted: Trøndelag - Trööndelage

INT-BILAT-BILAT-ordningen

USA - Improving Security By Improving Data

During the last 18 months Agder University College (AUC) has established an interdisciplinary collaboration with highly ranked US institutions (CERT/CC at Carnegie Mellon; Rockefeller College of Public Affairs and Policy, University at Albany; Sandia Nati onal Laboratories, Critical Infrastructur...

Tildelt: kr 0,47 mill.

Prosjektperiode: 2005-2009

Sted: Agder

INTSAMGEN-Internasjonalt samarbeid generelt

Advanced visualization tools for training and trust in highly complex process control work domains.

The collaboration aims to build a long-term collaboration in the Human-Systems Interaction field. New knowledge and solutions in this area will help improve performance in complex systems whose performance and safety rely on effective joint human and auto matic control and decision-making. Cognit...

Tildelt: kr 0,10 mill.

Prosjektperiode: 2005-2005

Sted: Østfold

INT-BILAT-BILAT-ordningen

Canada - Etablering av samarbeid mellom Norge og Canada om bioteknologiske muligheter innen oppdrett av flekksteinbit

Forskningsmiljøer og næringsaktører i Norge og Canada arbeider aktivt med å utvikle flekksteinbit frem til kommersiell næring. Så langt leder norske miljøer an i å utvikle produksjonsleddet i flekksteinbitoppdrett, mens kanadiske miljøer har et forsprang når det gjelder å utvikle de bioteknologis...

Tildelt: kr 0,10 mill.

Prosjektperiode: 2005-2007

Sted: Ukjent Fylke

INT-BILAT-BILAT-ordningen

USA - Second homes development in Norway and US/Wisconsin. A comparative study

The project will allow CRR to join the comparative research project that is planned by UW-Madison and make it a true collaborative effort between the institutions. In detail, money is needed to: a) Improvement/adjustment of WU-Madison researchers' alre ady planned preliminary field work in Nor...

Tildelt: kr 0,28 mill.

Prosjektperiode: 2005-2007

Sted: Trøndelag - Trööndelage