0 antall prosjekter

DIV-INT-Annet internasjonalt samarbeid

Northern Research Basin 2011

Northern Research Basin er ei arbeidsgruppe etablert i 1975 under det Internasjonale Hydrologiprogrammet. Formålet for gruppa er å fremme hydrologisk forskning i områder på den nordlege halvkule der snø, is og frosen mark har avgjerande betydning. Arbeids gruppa møtest kvart andre år og så langt ...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2011-2011

Sted: Trøndelag - Trööndelage

RENERGI-Fremtidens rene energisystemer

China: Norway-China cooperation and workshop on material research for renewable energy and efficiency applications (RENERMAT)

The functioning, efficiency, performance, integrity and life time of renewable energy systems are critically dependent on the material selection and design. One of the key areas in nanotechnology is to design and produce nanomaterials for renewable energy applications. The main objective of this...

Tildelt: kr 0,43 mill.

Prosjektperiode: 2011-2011

Sted: Trøndelag - Trööndelage

FORINFRA-Nasj.sats. forskn.infrastrukt

European Carbon Dioxide Capture and Storage Laboratory Infrastructure

The project aims at bringing ECCSEL forward to the EU-funded preparatory phase. The main goal of the project is to compose a successful application for funding through the EU FP7 Capacities program. The most important task is therefore to write the propos al for funding, which includes arranging ...

Tildelt: kr 3,0 mill.

Prosjektperiode: 2009-2011

Sted: Trøndelag - Trööndelage

RENERGI-Fremtidens rene energisystemer

General competence of CRT

CRT is first a hydropower machine which consist of two machines, the turbine and the generator integrated into one cohesive construction. In addition is the machine built with the two contra rotating stages integrated into one hydro dynamical optimal turb ine concept. This construction gives man...

Tildelt: kr 1,6 mill.

Prosjektperiode: 2008-2009

Sted: Trøndelag - Trööndelage

BIA-Brukerstyrt innovasjonsarena

LPD - Lean Product Development

The manufacturing industry in Norway as well as Europe is facing increased pressure to reduce manufacturing costs. Automation along with advanced manufacturing systems and lean manufacturing concepts has to some extent preserved Europe as a key area for m anufacturing. Manufacturing cost cutting,...

Tildelt: kr 11,6 mill.

Prosjektperiode: 2007-2011

Sted: Trøndelag - Trööndelage

TU-Tungt utstyr

Nanomekanisk testing for undersøkelse av hydrogenladning og lav temperatur (arktiske strøk) på egenskapene til stål.

Hydrogen indusert sprekking (HISC) av stål og egenskapene til stål ved lave driftstemperaturer (ned mot - 60 gr. C) er to store utfordringer som oljeindustrien i dag står overfor. Ved NTNU/SINTEF er det etablert en forskergruppe med stor internasjonal an nerkjennelse som arbeider med disse probl...

Tildelt: kr 2,6 mill.

Prosjektperiode: 2007-2008

Sted: Trøndelag - Trööndelage

NATURNAER-Natur og næring

Enhanced service life of coated wooden facades

Coated wooden claddings are widely used in Norway. But competition from other materials that has less input of labour at the construction site and less demands for maintenance is increasing. Discolouring fungi on the surface of coated wood in outdoor appl ications is an increasing concern. The to...

Tildelt: kr 5,6 mill.

Prosjektperiode: 2007-2011

Sted: Trøndelag - Trööndelage

TU-Tungt utstyr

Bioenergy Laboratory

There are three thermochemical routes suitable for the conversion of biomass: pyrolysis, gasification or direct combustion, and the primary products can be a synthetic gas (syn-gas), bio-oil, solid char and/or heat dependent on conversion technology emplo yed. Biomass gasification and combustion ...

Tildelt: kr 2,6 mill.

Prosjektperiode: 2007-2008

Sted: Trøndelag - Trööndelage

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

MIT-NTNU: Evaluation Methodology for Power Plants with CO2 capture

- Develop a methodology and a tool for evaluation and comparison of concepts for power plants with CO2 capture. The methodology comprise a common framework for computational models, component characteristics, cost estimation method including the use of pr obability density functions, and operabil...

Tildelt: kr 2,9 mill.

Prosjektperiode: 2007-2009

Sted: Trøndelag - Trööndelage

RENERGI-Fremtidens rene energisystemer

Numerical modelling of deltas in hydropower reservoirs

Numerical algorithms for computing three-dimensional changes in the geometry of deltas in hydropower reservoirs will be developed and tested in the project. The work will be based on existing 3D CFD programs capable of computing water and sediment transpo rt in rivers. The models are based on sol...

Tildelt: kr 3,6 mill.

Prosjektperiode: 2006-2011

Sted: Trøndelag - Trööndelage

MOBI-Mobilisering

Design som strategisk virkemiddel i bedrifts- og produktutvikling.

Prosjektet er en del av NFRs satsing innen Mobolisering for FoU-relatert innovasjon (MOBI), rettet mot Næringsrettet design, tverrfaglig samarbeid for økt fokus på design i utdannelser innenfor merkantile fag. Prosjektet vil bygge videre på erfaringer fr a utviklingen av kurset TPD4165 PD-8 Desi...

Tildelt: kr 0,50 mill.

Prosjektperiode: 2006-2008

Sted: Trøndelag - Trööndelage

IS-STP-Statsstipendprogram, utlendinger

Arnason, Stefan Islands statsstip 2006/07

...

Tildelt: kr 92 000

Prosjektperiode: 2006-2007

Sted: Trøndelag - Trööndelage

INT-BILAT-BILAT-ordningen

Japan-Norway Cooperation on Process Engineering within the Kyoto International Forum for Environment and Energy (KIFEE)

KIFEE (Kyoto International Forum for Environment and Energy) is an arena for research cooperation between Japan and Norway within the areas of energy and energy-related materials. KIFEE shall support the bilateral agreement on technology cooperation signe d in May 2003, and shall be open to all u...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2006-2007

Sted: Trøndelag - Trööndelage

INT-BILAT-BILAT-ordningen

Kina - Cooperation between Shanghai Jiao Tong Univ.(SJTU) and Norwegian University of Science and Technology (NTNU) within Gas Technology

Initial talks between the parties interested in gas technology were held in Shanghai late October 2005 during the visit of the NTNU Rector delegation. Natural gas is going to be an important energy source in the Shanghai region, based on imported LNG and gas pipeline from North West China. Why ...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2006-2007

Sted: Trøndelag - Trööndelage

INT-BILAT-BILAT-ordningen

USA - Cooperation between University of Maryland (UMCP) and Norwegian University of Science and Technology (NTNU) within Energy Technology

A MoU has been signed by the Presidents of UMCP and NTNU to develop cooperation within the energy area, to support the MOU entered between Department of Energy and Ministry of Petroleum and Energy in May 2004 on bilateral cooperation within the Energy Sec tor. On a strategy meeting at UMCP in Oc...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2006-2007

Sted: Trøndelag - Trööndelage

NANOMAT-Nanoteknologi og nye materialer

Nanostructured Polymer and Composite Particles: Mechanical Properties

In Norway there is a renewed interest in extending the Ugelstad method based polymer particle technology to microsystem applications by producing nanostructured (conductive) polymer and composite particles. In these applications, the characterization, ana lysis and control of mechanical propertie...

Tildelt: kr 2,1 mill.

Prosjektperiode: 2006-2011

Sted: Trøndelag - Trööndelage

NATURNAER-Natur og næring

Modelling and development of connections in timber structures

The competitiveness of timber structures depends on the connections. New fasteners may give more effective connections with respect to load bearing, stiffness and overall costs. Multi-storey timber houses have frames with shear-walls and diaphragms. Desig n restrictions due to openings in externa...

Tildelt: kr 4,0 mill.

Prosjektperiode: 2006-2011

Sted: Trøndelag - Trööndelage

IS-NAD-Samarbeid med NORAD-land

Li, Liangbi kinesisk statsstip 2005/06

...

Tildelt: kr 87 800

Prosjektperiode: 2005-2006

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. Data mining and knowledge discovery for smart reservoir characteraization

see attached file

Tildelt: kr 49 999

Prosjektperiode: 2005-2006

Sted: Trøndelag - Trööndelage

RENERGI-Fremtidens rene energisystemer

Doctoral fellowship: Energy optimization through exergy and irreversibility analysis in CFD of turbulent reactive flows

...

Tildelt: kr 2,1 mill.

Prosjektperiode: 2004-2007

Sted: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

Integrated Supply Chain and Maritime Transportation Planning - INSUMAR

...

Tildelt: kr 0,95 mill.

Prosjektperiode: 2004-2007

Sted: Trøndelag - Trööndelage

SUP-NHD-Strategiske UoH-progr.fin.NHD

Computational Methods for Viscous Flow around Moving Bodies close to Boundaries (MARINE-CFD)

...

Tildelt: kr 11,3 mill.

Prosjektperiode: 2004-2009

Sted: Trøndelag - Trööndelage

RENERGI-Fremtidens rene energisystemer

Hydrogen Production by Steam Gasification of Biomass

...

Tildelt: kr 1,9 mill.

Prosjektperiode: 2004-2006

Sted: Trøndelag - Trööndelage

F-KJEM-Naturvitenskap, kjemi

10th European Turbulence Conference

...

Tildelt: kr 0,10 mill.

Prosjektperiode: 2004-2004

Sted: Trøndelag - Trööndelage

SUPOPETR-SUP-OED Petroleumssektor

Improved overburden and reservoir characterization combining seismics and rock physics

...

Tildelt: kr 15,8 mill.

Prosjektperiode: 2004-2009

Sted: Trøndelag - Trööndelage

TEKNO-Naturvitenskap, grunnleggende teknologi

Virvelinduserte vibrasjoner til sirkulære sylingere ved høye Reynoldstall

Bakgrunn Et viktig begrep innen virvelinduserte vibrasjoner VIV er strømningens Reynoldstall, Re=UD/v. På oljefelt til havs opplever stigerør strømning med vesentlig høyere Reynoldstall enn hva man til nå har klart å reprodusere eksperimentelt i hydrodyna miske laboratorier. Dette er viktig, side...

Tildelt: kr 0,13 mill.

Prosjektperiode: 2003-2005

Sted: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

Dynamics of heavy lift operations MoU Singapore

...

Tildelt: kr 67 871

Prosjektperiode: 2003-2006

Sted: Trøndelag - Trööndelage

SUPOENER-SUP-OED Energi-sektoren

Wind energy strategic program 2003-2007

...

Tildelt: kr 19,6 mill.

Prosjektperiode: 2003-2010

Sted: Trøndelag - Trööndelage

TU-Tungt utstyr

Instrumentert kjøretøy og målevogn

Institutt for samferdselsteknikk, Fakultet for ingeniørvitenskap og teknologi, NTNU søker med dette Norges forskningsråd om bevilgning på kr 1.488.000 (inkl. mva) til videre utvikling av vårt adferds-analytiske laboratorium gjennom nyinnkjøp av instrument ert kjøretøy og målevogn. Et instrumente...

Tildelt: kr 1,5 mill.

Prosjektperiode: 2003-2006

Sted: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

Energy-efficient all electric ship

...

Tildelt: kr 10,9 mill.

Prosjektperiode: 2003-2009

Sted: Trøndelag - Trööndelage