0 antall prosjekter

ENERGIX-Stort program energi

MVO: Operating Agent for IEA HEV TCP Task 38 – Marine Applications

...prosjektet omfatter ledelse av Task 38 "Marine Applications"...IEAs "Technology Collaboration Programme" (TPC) for "Hybride and Electric Vechicles" (HEV)....batteri-elektriske og hybride fremdriftssystem for skip for å oppnå reduksjon av klimagassutslipp...

Tildelt: kr 0,25 mill.

Prosjektperiode: 2021-2023

Sted: Trøndelag - Trööndelage

LANDSKAP-Landskap i endring. Bruk og forvaltning

LAND. Conflicts and sustainability around second home development - The interplay between development factors, landscape changes and ecologi

...

Tildelt: kr 4,0 mill.

Prosjektperiode: 2003-2007

Sted: Innlandet

FRIMUF-Miljø- og utviklingsforskning

Integrated ecological and genetic approach to infer the spatio-temporal population-structure dynamics in small salmoid poplations.

...

Tildelt: kr 2,5 mill.

Prosjektperiode: 2004-2007

Sted: Oslo

OST-Øst-Europa-programmene

Conditionality, corruption and informal institutions: An analysis of corruption in the spheres of public procurement, party funding...

...

Tildelt: kr 3,0 mill.

Prosjektperiode: 2003-2006

Sted: Oslo

SIP-Strategiske instituttprogram

Key actors and the climate regime: Lessons and future options. Samarb. med FNI. Prosjekt 161715/V10.

...Samme prosjektsammendrag som prosjektnr...

Tildelt: kr 1,9 mill.

Prosjektperiode: 2004-2007

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Collaborative Advances in Remote sensing Technologies Applied to GMES Services in Europe and New services from challenges in the American A

...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2009-2010

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Right time integration and use of production data in reservoir characterization and sweep analysis to maximize the reservoir performance

...

Tildelt: kr 4,1 mill.

Prosjektperiode: 2005-2008

Sted: Akershus

NORKLIMA-Klimaendringer og konsekvenser for Norge

Variations of the Atlantic Meridional Overturning Circulation during rapid climate changes: calibration, modelling and palaeoceanographic ob

...

Tildelt: kr 0,39 mill.

Prosjektperiode: 2005-2009

Sted: Vestland

PES-INST-Prosjektetablererstøtte EU (FoU)

Substituting solvent with water borne panting in decorative paints in the Building&Construction sector. Identifying best practice, best avai

...

Tildelt: kr 50 000

Prosjektperiode: 2005-2005

Sted: Oslo

FORNY-3-Kommersialisering av FoUresultater

Obtaining in vivo data to judge the commercial potential of marine diatome apoptogen and marine cyanobacterial organic anion channel blocker

...

Tildelt: kr 1,4 mill.

Prosjektperiode: 2008-2010

Sted: Vestland

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of a sustainable scaleable energy generating system by use of strong rigid kites in high altitude, which transfer the windpower

...

Tildelt: kr 0,14 mill.

Prosjektperiode: 2011-2012

Sted: Agder

POLRES-Polarforskning POLRES

Reconstruction of late Holocene glacier and climate variability from the distal glacier-fed lake Kløsa at Mitrahalvøy, Spitsbergen

...

Tildelt: kr 51 329

Prosjektperiode: 2012-2012

Sted: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Include further enhancements into the Mepo optimisation software environment with application to history matching in res. (Arne Gulbrandsen)

...

Tildelt: kr 1,1 mill.

Prosjektperiode: 2004-2006

Sted: Akershus

FORNY-3-Kommersialisering av FoUresultater

Construction of human monoclonal antibodies by the FRIDA-method: potential medical use against cancer and infectious diseases.

...

Tildelt: kr 3,1 mill.

Prosjektperiode: 2007-2009

Sted: Oslo

UTISOR-Utviklingsveier i Sør

Institutional development in the Palestina Authority Areas. Conditions and criteria of institutional development and capacity - AVBRUDT!!!

...

Tildelt: kr 0,45 mill.

Prosjektperiode: 2002-2006

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

The Development of a Novel Remote Stress Sensing System to Increase Safety, Efficiency and Reduce Environmental Effects in Fishing and Moori

...

Tildelt: kr 0,13 mill.

Prosjektperiode: 2007-2008

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

CRafting Institutional SPace- The Role of Lifelong Learning in matching organisational and individual Careers in contemporary Europe

...

Tildelt: kr 39 999

Prosjektperiode: 2011-2011

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

The Skin Conductance Algesimeter, an individual pain threshold diagnostic tool to prevent development of acute and chronic postoperative pai

...

Tildelt: kr 50 000

Prosjektperiode: 2010-2011

Sted: Oslo

IS-NAD-Samarbeid med NORAD-land

REISESTØTTE:Planned research cooperation and joint PhD supervision within the topic of green communications in mobile communication networks

...

Tildelt: kr 10 000

Prosjektperiode: 2013-2014

Sted: Agder

IS-NAD-Samarbeid med NORAD-land

Analysis of the quantitative genetics and molecular markers associated with growth traits, Huaping Zhu - kinesisk statsstipendiat 2013/14

...

Tildelt: kr 0,16 mill.

Prosjektperiode: 2013-2014

Sted: Troms - Romsa - Tromssa

PES-EU-Prosjektetablererstøtte EU (bedrift)

coHerent measures and environmental interventions to debottleneck hUBs of the multimodal nreWork fAvoured bY Seamless flow of goods

...

Tildelt: kr 29 999

Prosjektperiode: 2011-2011

Sted: Akershus

HAVKYST-Havet og kysten

MarinEra - Marine phylogeographic structuring during climate change: the signature of leading and rear edge of range shifting populations.

...

Tildelt: kr 2,7 mill.

Prosjektperiode: 2009-2012

Sted: Vestland

BIA-Brukerstyrt innovasjonsarena

Dataassistert verktøy for bærekraftig produktinformasjon (Data assisted tool for sustainability product information)

...som opererer i et globalt marked blir stilt overfor stadig økende krav...og prosesser knyttet til produkter. Det finnes i dag relativt gode og standardiserte...men tilsvarende er langt dårligere utviklet for sosiale forhold, bl.a. påvirkning på...

Tildelt: kr 1,2 mill.

Prosjektperiode: 2007-2009

Sted: Møre og Romsdal

SKOGFOND-Utviklingsfondet for skogbruket

Mer effektive metoder for montering og flytting av taubaner

...Skal vi oppfylle målsettingen om økt avvirkning i...settes in ressurser på de områdene det er potensial for å øke produktiviteten/aktiviteten. Det er...att en ikke har hatt den produktivitetsøkningen som en ser i det ordinære terrenget med...

Tildelt: kr 0,60 mill.

Prosjektperiode: 2008-2010

Sted: Trøndelag - Trööndelage

NOS-HS-Sekr. nord. sam.nemd. HumSam

NOP Nordic Journal of Human Rights

...vedlegg A. Om tidsskriftet Nordic Journal of Human...kjent under tittelen Nordisk Tidsskrift for Menneskerettigheter - utgis av Norsk senter...menneskerettigheter i samarbeid med Universitetsforlaget. Tidsskriftet publiserer fra nr 1/2010...

Tildelt: kr 0,14 mill.

Prosjektperiode: 2013-2014

Sted: Oslo

INT-BILAT-BILAT-ordningen

JAPAN: Forprosjekt for fleksibel, adaptiv og intelligent automatisering ved hjelp av mikro- og nano sensorer

...er et forprosjekt for å etablere et prosjekt med NTNU og...Research Center og National Institute of Advanced Industrial Science and Technology...Ny teknologi gir nye muligheter for automatisering so m er radikalt mer fleksibelt,...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2007-2008

Sted: Innlandet

OST-Øst-Europa-programmene

Workshop i forbindelse med opprettelse av forskningskonsortium innen nordområdeforskning

...SINTEF Byggforsk er i utredningsfase vedrørende...i løpet av sommeren 2009. Forskningen vil i stor grad omfatte geotekniske og...til petroleumsvirksomheten i nordområdene. Hovedpartnere i dette nettverket vil i første omgang...

Tildelt: kr 0,30 mill.

Prosjektperiode: 2009-2009

Sted: Trøndelag - Trööndelage

ENERGIX-Stort program energi

SET 5 - EU: Strategisk deltakelse i EU SET-plan fora for energibruk i bygninger - ECTP og E2BA

...hovedmål er større norsk deltakelse i EU-finansiert forskning og utvikling på...at NTNU, i samarbeid med SINTEF, tar ansvaret for å representere Norge i de relevante europeiske...Technology Platform og E2BA (Energy Efficiency in Buildings Association) . Det er bare NTNU og...

Tildelt: kr 0,37 mill.

Prosjektperiode: 2012-2014

Sted: Trøndelag - Trööndelage

FORNY-3-Kommersialisering av FoUresultater

Infrastrukturmidler 2006 - NIVA

...samarbeid med Forskningsparken startet NIVA...denne perioden. På det mer overordnede plan er innovasjonsledelse og -strat egi kommet på plass....AS er revitalisert med tanke på kommersialisering av FoU-resultater og det er etablert en...

Tildelt: kr 0,25 mill.

Prosjektperiode: 2006-2006

Sted: Oslo

MARINFORSK-Marine ressurser og miljø

Havforskermøtet 2019

...er for tiden et press i retning av å prioritere...har fått lite fokus og trenger et løft. Havforskermøtet har blitt arrangert årlig siden 1949,...senere årene har det deltatt mellom 40 og 100 forskere fra hele landet. Sammen med Norsk...

Tildelt: kr 92 306

Prosjektperiode: 2019-2019

Sted: Oslo