0 antall prosjekter

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Geological Evolution of the Barents- and Kara Seas hydrocarbon provinces

The project involves the synthesis of existing geological and geophysical data from the Norwegian and Russian Arctic basins, and their interpretation using an interdisciplinary approach. By combining potential field data with seismic lines, further calibr ated with deep wells, shallow boreholes a...

Tildelt: kr 2,9 mill.

Prosjektperiode: 2006-2009

Sted: Trøndelag - Trööndelage

BIA-Brukerstyrt innovasjonsarena

High-value aluminium end products from extruded sections

During the past 5-10 years, the aluminum industry, and the extrusion industry particularly, has gone from being operated locally to a global industry with increasing competition from other materials, and increasing demands on quality and price. At the sam e time, low cost countries in the Far Eas...

Tildelt: kr 17,2 mill.

Prosjektperiode: 2006-2011

Sted: Oslo

PETROMAKS2-Stort program petroleum

Bayesian Lithology-Fluid Inversion based on Well and Seismic Data

Information about petroleum reservoirs are collected in wells or seismic surveys. Well observations are precise but spatially sparse. Seismic data is indirect and fairly unprecise, but has good spatial coverage. Physical models for these data acquisition procedures are well established. Reservoi...

Tildelt: kr 5,9 mill.

Prosjektperiode: 2006-2013

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Electrical Insulation Materials and Insulation Systems for Subsea High Voltage Power Equipment

Reliable power supply and distribution components are of vital importance for subsea processing. The service experience and technologies from on-shore installations have initially been adopted for subsea applications. However, sufficient reliable high vol tage concepts to meet the need for enhanc...

Tildelt: kr 24,7 mill.

Prosjektperiode: 2006-2013

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

GPlates - A Novel Exploration Tool

Plate reconstructions have been an integral part of petroleum-related research since the advent of the plate tectonic paradigm. The GPlates consortium grew from the need to create a new plate motion model that can be linked to commonly used geological dat abases and to geodynamic models. GPlates ...

Tildelt: kr 5,8 mill.

Prosjektperiode: 2006-2009

Sted: Trøndelag - Trööndelage

EVITA-eVitenskap

Discrete Optimization Methods in Maritime and Road-based Transportation

Efficient maritime and road-based transport is very important to economies, Norway in particular. In 2002, the cost of sea transport world-wide was 120 billion USD. Even small improvements in logistics efficiency through optimization based decision-suppor t systems (DSS) will have huge economical...

Tildelt: kr 6,5 mill.

Prosjektperiode: 2006-2010

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Electric power systems for subsea processing and transportation of oil and gas

SINTEF Energy Research proposes a joint long term research project involving oil companies, supplier industry, NTNU and the Norwegian Research Council with the intention to boost the knowledge and skills on design, analysis and verification of systems for transmission and distribution of power t...

Tildelt: kr 8,1 mill.

Prosjektperiode: 2006-2012

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Flerfasestrøm med gasshydrater

...

Tildelt: kr 2,1 mill.

Prosjektperiode: 2006-2009

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Hydrates in Petroleum Production - Deposition Characteristics

Hydrate plugging of pipelines and equipment during petroleum production is associated with high costs. Traditional methods for hydrate avoidance are quite conservative, leading to inefficient use of capital and limitations in new developments. It has been shown, however, that even when operating...

Tildelt: kr 7,7 mill.

Prosjektperiode: 2006-2010

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Prevention of hydrogen induced stress cracking (HISC) in subsea pipelines and production systems made from stainless steel.

There has been an increasing trend in the use of stainless steel alloys instead of carbon steel for subsea flowlines and production systems during the last 10 years in the oil industry. Even if this normally is a more robust solution compared to the use of carbon steel insofar as internal corros...

Tildelt: kr 6,9 mill.

Prosjektperiode: 2006-2012

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Enhanced Oil Recovery in Fractured Carbonate Reservoirs

A collaboration between 3 University research groups in France, UK and Norway and 3 oil companies will try to improve oil recovery in fractured carbonate reservoirs by establishing a better understanding of the dominant in-situ oil recovery mechanisms dur ing stimulated production; including wate...

Tildelt: kr 5,3 mill.

Prosjektperiode: 2006-2010

Sted: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

SmartPipe - Self diagnostic pipelines and risers for future integrated process management

...

Tildelt: kr 15,0 mill.

Prosjektperiode: 2006-2010

Sted: Trøndelag - Trööndelage

SUP-NHD-Strategiske UoH-progr.fin.NHD

Materials for sensor and imaging applications

The objective of the SUP is to establish UiO as an internationally leading institution with respect to research and development of sensor and imaging materials for selected applications. The project aims at integrating strong experimental and theoretical activities in chemistry, physics, material...

Tildelt: kr 6,0 mill.

Prosjektperiode: 2006-2012

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Liquefaction of Unprocessed Well-Stream

Commercial exploitation of remote gas is considered as a major challenge by the oil and gas industry. A breakthrough approach based on the Liquefied Unprocessed Well-Stream concept may result in an alternative option for offshore gas liquefaction. The pr oject proposal is based on a concept to l...

Tildelt: kr 13,2 mill.

Prosjektperiode: 2006-2010

Sted: Akershus

BIA-Brukerstyrt innovasjonsarena

Intellifeed - Intelligent lager og tilførselssystem for automatisert produksjon av store produkter

Gjennom en state of the art undersøkelse vil prosjektet bringe fram en beskrivelse av den kunnskapen som finnes om automatisk lagring, tilførsel og mating av stor produkter. I prosjektet defineres dette som produkter med største dimensjon i området mellom 200 mm og 2m. Kartlegging og utvikling...

Tildelt: kr 14,1 mill.

Prosjektperiode: 2006-2011

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Regularity and uncertainty analysis and management for the Norwegian gas processing and transportation system

The project will contribute to increase the efficiency of Norwegian transportation systems for natural gas, by developing theory and tools both for dynamic planning and configuration of the network, future infrastructure investments, as well as decisions related to ageing, maintenance and other o...

Tildelt: kr 20,0 mill.

Prosjektperiode: 2006-2011

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Robotics technology for supplementing and extending human inspection and intervention capabilities

...

Tildelt: kr 12,8 mill.

Prosjektperiode: 2006-2009

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

eControl, drilling simulation and control for extreme conditions

...

Tildelt: kr 11,5 mill.

Prosjektperiode: 2006-2013

Sted: Agder

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Wireless electromagnetic data communication for downhole use

Flexible smart well solutions for oil wells are limited due to a lack of available systems for wireless data communication. To obtain fully autonomous control and monitoring units downhole, power will have to be generated on the spot and power efficient w ireless communication is critical. A sub...

Tildelt: kr 7,8 mill.

Prosjektperiode: 2006-2011

Sted: Trøndelag - Trööndelage

BIA-Brukerstyrt innovasjonsarena

Autovernstolper med retningsbestemte egenskaper

Dagens autovern har en stolpe av impregnert trevirke og er kun godkjent på grunn av manglende alternativer. Plasto har teknologi basert på miljøvennlige, resirkulerbare termoplaster. Ved å videreutvikle denne kompetansen har vi som mål å utvikle miljøvenn lige løsninger som har bedre ytelse. Kons...

Tildelt: kr 13,9 mill.

Prosjektperiode: 2006-2010

Sted: Møre og Romsdal

MAROFF-2-Maritim virksomhet og offsh-2

Coping with Risk in Maritime Logistics - Managing vulnerability, risk and resilience in maritime logistics chains

Ship-owners being able to offer logistics services that cover the complete maritime logistics chain, including planning, control, management, improvement and optimization, brings new areas of opportunities, e.g. better control of resources and interfaces, but also increased vulnerabilities and r...

Tildelt: kr 14,3 mill.

Prosjektperiode: 2006-2013

Sted: Trøndelag - Trööndelage

BIA-Brukerstyrt innovasjonsarena

Innovation in responce to new regulations of materials in a life cycle, functional and holistic perspective

Innochem 2006 is a collaboration between Jotun and Håg as industrial partners, a number of their main suppliers, with strong support from the Norwegian, Nordic and European Chemical and Paint Industry. The project is directly connected to the REACH imple mentation program carried out by the EU C...

Tildelt: kr 8,6 mill.

Prosjektperiode: 2006-2011

Sted: Vestfold

BIA-Brukerstyrt innovasjonsarena

Kimdanningskontroll for optimaliserte egenskaper

Al-Mg-Si-(Cu), som er den vanligste typen Al-legeringer til strukturelle formål, får sin styrke fra utfelling, presipitering, av herdende partikler, presipitater. Tetthet og fordeling av presipitater er det som i hovedsak definerer egenskapene til legerin gen. Det har, delvis med NFR-støtte, vært...

Tildelt: kr 20,2 mill.

Prosjektperiode: 2006-2014

Sted: Oslo

BIA-Brukerstyrt innovasjonsarena

Ny kurs for grafisk bransje: fra kostnadsdrevet prosessinnovasjon til brukerdrevet tjenesteinnovasjon

Globaliseringen av den grafiske industrien og teknologisk utvikling mot digitalisering av informasjon, mediekonvergens og utviklingen av Internett gir en nåsituasjon der grafiske produkter oftere kan kjøpes på verdensmarkedet av den som tilbyr lavest pris . Behovet for nyskaping er stort. VISKOM ...

Tildelt: kr 6,6 mill.

Prosjektperiode: 2006-2010

Sted: Oslo

GLOBHELS-Global helse

Norwegian Forum for Global Health Research

According to the statutes the Forum shall promote high quality research and training aiming at improving health and health care for marginalized population groups in low- and middle-income countries. The main strategies applied to fulfill the objectives of the Forum include activities to: " Imp...

Tildelt: kr 1,9 mill.

Prosjektperiode: 2006-2013

Sted: Vestland

MATPROG-Matprogrammet: Norsk mat fra sjø og land

Automatic Fish Fillet Inspection by Imaging Spectroscopy

The main objective of this project is to provide the Norwegian fish processing industry with a technological solution for automatic quality control in fish fillet production. Development of methods and tools will be based on the use of imaging spectroscop y. Quality features of fish fillets are ...

Tildelt: kr 7,9 mill.

Prosjektperiode: 2006-2010

Sted: Troms - Romsa - Tromssa

PETROMAKS2-Stort program petroleum

E-centre laboratories for automated drilling processes

The introduction of large amounts of real time data communicated to onshore e-centers can improve decision making processes and cost efficiency both in the planning phase and during the operational stage. The new e-center working philosophy will lead to l arge changes. New roles, responsibilities...

Tildelt: kr 29,0 mill.

Prosjektperiode: 2006-2013

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Multiscale Simulation of Highly Heterogeneous and Fractured Reservoirs

During the last 2-3 years, SINTEF has in collaboration with NTNU developed new multiscale methods for computing pressure and flow velocities in petroleum reservoirs. In the current project we wish to develop these methods further and demonstrate to the oi l industry that multiscale methods can be...

Tildelt: kr 7,1 mill.

Prosjektperiode: 2006-2009

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Wireless instrumentation and sensor systems

...

Tildelt: kr 12,4 mill.

Prosjektperiode: 2006-2009

Sted: Akershus

BIA-Brukerstyrt innovasjonsarena

Automatisk 3D kontroll for stykkproduserende industri

Bruk av 3D geometriske modeller har i dag blitt et viktig verktøy i design, utvikling og produksjon av maskinerte og formede produkter. Høy kompetanse på og effektiv utnyttelse av slike verktøy er et konkurransefortrinn som kan støtte opp under fortsatt s tykkproduserende industri i Norge og andr...

Tildelt: kr 5,3 mill.

Prosjektperiode: 2006-2009

Sted: Oslo