0 antall prosjekter

DEMO2000-Prosj.ret tekn.utv. petro.virk

Utvikling og marinisering av Compact Concentric Cylindrical Cyclone (4C)

...

Tildelt: kr 2,3 mill.

Prosjektperiode: 2003-2004

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Kværner MultiBooster - Subsea Pilot Installation

...

Tildelt: kr 5,8 mill.

Prosjektperiode: 2002-2004

Sted: Buskerud

BP-FAG-Naturvitensk,berg og petroleum

Modelling of particle interaction and numerical simulation of compressible fluid flow with particles

The proposed project is a continuation of an ongoing line of research at NTNU and SINTEF Energy Research aimed at the numerical solution of three-dimensional transient compressible multi-fluid models for multiphase flow. Emphasis will be given to flows wi th particles (i.e. droplets), as encounte...

Tildelt: kr 1,7 mill.

Prosjektperiode: 2002-2005

Sted: Trøndelag - Trööndelage

BP-FAG-Naturvitensk,berg og petroleum

Modelling and numerical simulation of turbulent flows with droplets in the presence of an electric field

The proposed project is closely related to the ongoing research collaboration between NTNU, SINTEF, ABB, Norsk Hydro, Statoil and Elf to improve the design of coalescers for separating oil and water and the SIP named Particle Technology. The research top ic is modelling of the interaction of tur...

Tildelt: kr 1,7 mill.

Prosjektperiode: 2002-2005

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Reservoir Characterization and Prediction Uncertainty Assessment through Scale Splitting

...

Tildelt: kr 5,4 mill.

Prosjektperiode: 2002-2005

Sted: Rogaland

OG-Program for olje og gass

Optimised seismic processing with acurate traveltime approximations

...

Tildelt: kr 1,00 mill.

Prosjektperiode: 2002-2004

Sted: Trøndelag - Trööndelage

BP-FAG-Naturvitensk,berg og petroleum

Numerical simulation of coalesence and dispersion in the presence of an electric field

The project is a part of an ongoing research collaboration between NTNU, SINTEF, ABB, Norsk Hydro, Statoil and Elf to improve the design of coalescers for separating oil and water. The current project involves direct numerical simulation of drop motion in cluding instability, dispersion and merge...

Tildelt: kr 1,6 mill.

Prosjektperiode: 2002-2005

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Microseismic Emissions-Heartbeats of a Reservoir

...

Tildelt: kr 3,2 mill.

Prosjektperiode: 2002-2005

Sted: Akershus

OG-Program for olje og gass

Prediction and upscaling of thermal condutivities in sedimentary rocks

...

Tildelt: kr 3,3 mill.

Prosjektperiode: 2002-2004

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Eletrocoalescence - Droplet-droplet interaction and coalescence in eletric fields and turbulent flow - eksperiments and modelling

...

Tildelt: kr 8,4 mill.

Prosjektperiode: 2002-2005

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Petrofysikk under spenning (Petrophysics under stress)

...

Tildelt: kr 5,0 mill.

Prosjektperiode: 2002-2006

Sted: Trøndelag - Trööndelage

DEMO2000-Prosj.ret tekn.utv. petro.virk

OptoRiser - Manufacturing and testing of a flexible riser including a fibre-optic monitoring system with integrated sensors for detection of

...

Tildelt: kr 1,7 mill.

Prosjektperiode: 2002-2009

Sted: Trøndelag - Trööndelage

BP-FAG-Naturvitensk,berg og petroleum

Risikostyring for planlegging av brønnoperasjoner - utvikling av modeller og beslutningskriterier

En hovedutfordring i prosjektet er videre- og nyutvikling av årsaks- og konsekvensmodeller for uønskede hendelser i konstrukjson samt drift og vedlikehold av brønner. Årsaksmodellene beskriver betingelsene for at hendelser inntreffer basert på fysikk og o perasjonslogikk. Sannsynligheten for hend...

Tildelt: kr 1,4 mill.

Prosjektperiode: 2001-2005

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

RISERLESS COILED TUBING INTERVENTION SYSTEM (RICTIS)

...

Tildelt: kr 5,2 mill.

Prosjektperiode: 2001-2009

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Norsk Presidentskap - World Petroleum Council

...

Tildelt: kr 0,42 mill.

Prosjektperiode: 2000-2005

Sted: Ukjent Fylke

PETROFOR-Grunnleggende petroleumsforskning

Pore pressure prediction from seismic data

Results described in the paper "Discrimination between pressure and fluid saturation changes from time lapse seismic data" will be used as a basis for devoloping a method for pressure prediction from one seismic data set only. By using multioffset seismi c data combined with geological knowledge...

Tildelt: kr 1,3 mill.

Prosjektperiode: 2000-2005

Sted: Trøndelag - Trööndelage

SIPOPETR-SIP-OED Petroleumssektoren

Prediction of hydrocarbon phases in reservoirs by use of selected hydrocarbon components

...

Tildelt: kr 14,9 mill.

Prosjektperiode: 1999-2004

Sted: Trøndelag - Trööndelage