0 antall prosjekter

PES-EU-Prosjektetablererstøtte EU (bedrift)

Filler and fiber improved rotational moulding

...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2009-2010

Sted: Telemark

PES-EU-Prosjektetablererstøtte EU (bedrift)

Computerised Decision Support in Run-Time with adaptive and self-auditable predictions

...

Tildelt: kr 0,12 mill.

Prosjektperiode: 2009-2009

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Hybrid Collective Intelligence for Systems Biology

...

Tildelt: kr 49 999

Prosjektperiode: 2009-2009

Sted: Akershus

PES-INST-Prosjektetablererstøtte EU (FoU)

New Multi-HAzard and MulTi-RIsK Assessment MethodS for Europe

...

Tildelt: kr 99 999

Prosjektperiode: 2009-2010

Sted: Oslo

INFRA-Infrastrukturtiltak

Gave ved SINTEF Fiskeri og havbruk AS 10-års jubileum

...

Tildelt: kr 29 999

Prosjektperiode: 2009-2011

Sted: Trøndelag - Trööndelage

PES-EU-Prosjektetablererstøtte EU (bedrift)

Training Optimisation Through Instructor Assistance

...

Tildelt: kr 39 942

Prosjektperiode: 2009-2010

Sted: Rogaland

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of a hygienic polyethylene coating for the protection of refrigerated Sea-water (RSW) tanks on fishing vessels that prolong lif

...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

ShipGlider

...

Tildelt: kr 79 999

Prosjektperiode: 2009-2010

Sted: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

Marine Coating; Utvikling og testing av miljøvennlig løsemiddelfritt bunnstoff med tilfredsstillende antifouling effekt

AMC (Advanced Marine Coatings) og Re-Turn har utviklet et løsemiddelfritt nano-karbonrør forsterket epoksy bunnstoff som gir en revolusjonerende glatt og slitesterk overflate for redusert drivstoff forbruk på skip. For å ha en aktiv overflate som forhindr er groing, har AMC også en nanokapsel tek...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2009-2010

Sted: Akershus

PES-EU-Prosjektetablererstøtte EU (bedrift)

Performance of Mobile Wireless Sensor Networks

...

Tildelt: kr 99 999

Prosjektperiode: 2009-2010

Sted: Oslo

SKOGFOND-Utviklingsfondet for skogbruket

Internasjonale konferansen Ecology and Forests for Public Health 18.-20.9.2009 på Soria Moria Hotell i Oslo.

Internasjonale konferansen Ecology and Forests for Public Health 18.-20.9.2009 på Soria Moria Hotell i Oslo.

Tildelt: kr 75 000

Prosjektperiode: 2009-2009

Sted: Agder

HAVBRUKS-Havbruk - en næring i vekst

Skalldyrkonferansen 2009

Skalldyrkonferansen samler etablerte og potensielle dyrkere, utstyrleverandører, forskere og sentrale offentlige instanser. Den har fungert som et læringsverksted for aktørene og vært til inspirasjon for mange. Blue Planet tok et initiativ overfor FHL om å videreføre Skjellkonferansen fra og med...

Tildelt: kr 49 999

Prosjektperiode: 2009-2009

Sted: Rogaland

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of a novel, compact, cost effective and energy efficient biofilm reactor and membrane filtration system for wastewater treatment

...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2009-2010

Sted: Vestfold

PES-INST-Prosjektetablererstøtte EU (FoU)

Systematic screening for novel hydrolases from hot environments

...

Tildelt: kr 0,18 mill.

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Small scale low temperature Solar Thermal Power Cogenerating System for buildings with large roof surface - Stirling Heat Engine and Non Con

...

Tildelt: kr 49 999

Prosjektperiode: 2009-2010

Sted: Akershus

PETROMAKS2-Stort program petroleum

Lifetime prediction of polymer-, elastomer and composite materials for sub sea application in arctic and deep water regions

PolyLife prosjektet har utforsket aldring av polymermaterialer i de aggressive miljøer, som ligner miljøene de anvendes i ved olje- og gassutvinning. I prosjektperioden er det blitt etablert laboratorier med utstyr designet til å utføre aldringstester i krevende miljøer og for å utføre målinger a...

Tildelt: kr 12,5 mill.

Prosjektperiode: 2009-2015

Sted: Oslo

VERDIKT-Kjernekomp.og verdiskaping IKT

Illustrated Ultrasound - Supporting Communication between Radiologist, Ultrasound Examiner, and Patient with Interactive Visualization

Ultrasound is reported to be difficult to interpret by medical personnel and is nearly impossible to understand by non-expert observer. This project aims at technology which effectively handles this interpretation challenge for better intra-clinical and d octor-to-patient communication. Potential...

Tildelt: kr 8,4 mill.

Prosjektperiode: 2009-2013

Sted: Vestland

PES-INST-Prosjektetablererstøtte EU (FoU)

Semantically Enriched Multi-sourcing Environment Supporting Sustainable Enterprises ecosystems

...

Tildelt: kr 74 999

Prosjektperiode: 2009-2009

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of cost-effective, water based power take-off system for marine energy

...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2009-2010

Sted: Trøndelag - Trööndelage

VAM-Velferd, arbeid og migrasjon

Network on employment of migrant workers in China

As China continues to develop its economy in a global context of financial crises and reduced international demand for Chinese goods, the role of migrant workers continues to be crucial. Their livelihoods, rights and social security are important issues f or researches and policy makers alike. Th...

Tildelt: kr 0,50 mill.

Prosjektperiode: 2009-2012

Sted: Oslo

VAM-Velferd, arbeid og migrasjon

Nordic models facing crisis: Implications for labour market adjustment and inclusion.

This project aims to compare the implications of the global crisis for workforce adjustment at company level and for perceptions of employment security and risk in the Nordic labour forces. While the Nordic models won praise for their ability to adapt and recover after the homemade crises of the...

Tildelt: kr 5,0 mill.

Prosjektperiode: 2009-2014

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Teknologisk optimalisering av lengdestrømsrenner som oppdrettssystem

...

Tildelt: kr 0,16 mill.

Prosjektperiode: 2009-2010

Sted: Troms - Romsa - Tromssa

PES-INST-Prosjektetablererstøtte EU (FoU)

A Systems Biology Attack on Metastasis: the Fatality of Melanoma

...

Tildelt: kr 0,25 mill.

Prosjektperiode: 2009-2010

Sted: Oslo

STAB-Statistikk og kunnsk.grunnlag

Variations in reporting of R&D statistics from firms in Norway

The project will investigate if there is a substantial underreporting of R&D from Norwegian firms to the R&D statistics by Statistics Norway. The analysis will give explanations and feed into the debate about the understanding of intramural R&D in firms a nd possibly also impact the formulation o...

Tildelt: kr 1,4 mill.

Prosjektperiode: 2009-2011

Sted: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

Brownfield regeneration through sorbent amendment

...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Sustainable and Innovative Sludge Treatment and Integrated Management for Resources recovery

...

Tildelt: kr 90 000

Prosjektperiode: 2009-2010

Sted: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

integrated Versatile Image and Sensor communications Infrastructure for Omnipresent Networks

...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2009-2010

Sted: Akershus

HAVBRUKS-Havbruk - en næring i vekst

Larvi 2009 - 5th fish and shellfish larviculture symposium

Larvi-konferansen er uten sammenligning verdens mest rennomerte konferanse innen yngelproblematikk på marine arter. Konferansen er avholdt hvert fjerde år, alltid i Gent. Forskningsrådet har vært en hovedsponsor i alle Larvi-konferansene som er gjennomfør t så langt. Dette er den direkte årsaken ...

Tildelt: kr 84 833

Prosjektperiode: 2009-2010

Sted: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

Elektrisk drevet pod/utenbordsmotor

Det er en rekke teknologier som må utvikles og designes til et konsept med høy pålitelighet, minimalt vedlikehold og konkurransedyktige ytelser og kostnader. Dette gjelder: 1) Utvikling av en kompakt vannkjølt elektrisk permanent magnet motormed liten y tre diameter og lengde som kan drive en p...

Tildelt: kr 99 999

Prosjektperiode: 2009-2009

Sted: Agder

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of medium and high capacity tensiometer and tensiocone for field measurement of negative porewater pressure

...

Tildelt: kr 29 561

Prosjektperiode: 2009-2010

Sted: Trøndelag - Trööndelage