0 antall prosjekter

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Vertical transport of liquids in petroleum production

...

Tildelt: kr 0,86 mill.

Prosjektperiode: 2008-2009

Sted: Trøndelag - Trööndelage

PETROMAKS2-Stort program petroleum

Shift work, sleep and health among offshore workers. A longitudinal study.

The present projects comprise two studies of shift work in the offshore sector. Study1 consists of an investigation into the effects of shift work among 260 employees on one offshore installation. Subjective data on sleep, working environment and health w ill be collected as well as objective mea...

Tildelt: kr 7,2 mill.

Prosjektperiode: 2008-2013

Sted: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Interdisciplinary Risk Assessment of Integrated Operations addressing Human and Organisational Factors

The objective of RIO is to provide important contributions to risk management of integrated operations (IO) by developing new knowledge, frameworks and guidance for risk assessment in petroleum activities. It is a widely accepted view that technical/quan titative risk analysis and management bas...

Tildelt: kr 7,3 mill.

Prosjektperiode: 2008-2012

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Rapid transportation of complex fluid mixes.

An effective way of planning and operating process plants and pipeline networks is the use of simulations. Accurate simulations make it possible to cut costs and increase the safety and accuracy of the estimated capacity and thus increase the capacity. An important part of this is the understand...

Tildelt: kr 65 176

Prosjektperiode: 2008-2008

Sted: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Optimization of operation control, capacity estimation and monitoring of gas transport

The Norwegian gas production is transported in large diameter pipelines to Europe, covering around 15% of the European natural gas consumption. Otimal operation of this network is necessary to continue developing the competitive edge of Norwegian natural gas in Europe, and also embedded in TTA8. ...

Tildelt: kr 58 135

Prosjektperiode: 2008-2009

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Prototype test of submerged fully automated drilling rig

...

Tildelt: kr 5,9 mill.

Prosjektperiode: 2008-2010

Sted: Rogaland

PETROMAKS2-Stort program petroleum

URE - Uncertainty in Reservoir Evaluation - High-Contrast Spatial Features

Project summary: After decades of research on stochastic reservoir characterization, mapping of average properties and representation of heterogeneities are in frequent use in the petroleum companies. Methodologies for data integration and uncertainty ar e also available. Focus of the current pr...

Tildelt: kr 6,4 mill.

Prosjektperiode: 2008-2013

Sted: Trøndelag - Trööndelage

NAERINGSPH-Nærings-phd

Utvikling av prosessmineralogi til optimalisering og økt verdiskaping av mineralproduksjonen ved NCM

Økte krav til HMS og produktkvalitet er klare utviklingstrender innen mineralbransjen. En konsekvens av dette er at mineralbedrifter som ønsker å ha et langsiktig perspektiv for sin virksomhet må styrke sin interne kompetanse på kunnskap om mineralogien i mineralforekomstene, og hvordan minerale...

Tildelt: kr 1,0 mill.

Prosjektperiode: 2008-2013

Sted: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Vascular gas bubbles and endothelial damage in relation to saturation diving.

The research project suggested is part of a competence program in diving initiated by StatoilHydro going from 2007 to 2011, but needs additional financial support to be completed. The major challenge for all parties involved in the exploitation of the o il and gas resources is to secure that ma...

Tildelt: kr 4,1 mill.

Prosjektperiode: 2008-2011

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Biota Guard IO Center

Oljeindustrien er konfronert med stadig større krav til faktabasert bevisførsel for å kunne dokumentere at offshore bore- og produksjonsoperasjoner blir gjennomført på en miljømessig forsvarlig måte. Kravene forsterkes etterhvert som industrien flytter si n aktivitet til nye og mer miljøsensitive...

Tildelt: kr 99 999

Prosjektperiode: 2008-2008

Sted: Rogaland

BILATNAER-Bilat.samarb.m.N-AM,Kina,Jpn,I

Gas Technology PhD program with MIT, NTNU and StatoilHydro

Therefore the present project is an important part of NTNU strategy within the area Energy and petroleum- resources and environment. It is supported by the university management. Possible new topics identified so far are (persons responsible for the init iatives are listed in parenthesis): - Tra...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2008-2008

Sted: Trøndelag - Trööndelage

DEMO2000-Prosj.ret tekn.utv. petro.virk

CMP Dual Gradient Drilling JIP

...

Tildelt: kr 10,9 mill.

Prosjektperiode: 2008-2015

Sted: Vestland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Rotating T-sensor for accurate and reliable field gradient measurements to determine the corrosion protection of pipelines and structures

...

Tildelt: kr 1,5 mill.

Prosjektperiode: 2008-2013

Sted: Akershus

PETROMAKS2-Stort program petroleum

Novel biomarkers for the prediction of health consequences from occupational exposure to benzene in 12 versus 8 h work shifts

There has recently been reported an increased risk of blood derived malignancies among Norwegian offshore workers. This could indicate that the exposure to carcinogenic benzene has been higher than published for this industry, or that the increased risk f or these malignancies can be found at low...

Tildelt: kr 9,2 mill.

Prosjektperiode: 2008-2013

Sted: Vestland

PETROMAKS2-Stort program petroleum

Working hours,health,and safety in the petroleum industry, A longitudinal prospective study.

Hovedmål med studien var å bestemme om skift/natt arbeid sammen med psykososialt arbeidsinnhold har betydning for mentale helseplager blant onshore- og offshoreansatte i norsk petroleumssektor. Deltakerne besvarte spørreskjemainstrumenter to ganger: 1772 (av 3258 inviterte = 54,4%) besvarte førs...

Tildelt: kr 4,4 mill.

Prosjektperiode: 2008-2015

Sted: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

Hybrid Riser Solution for Deep Water & Harsh Environments - Phase 2

...

Tildelt: kr 1,6 mill.

Prosjektperiode: 2008-2009

Sted: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

eDrilling Qualification and Demonstration

...

Tildelt: kr 6,3 mill.

Prosjektperiode: 2008-2010

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Global Virtual Integrated Collaboration Environment for Real-Time Drilling Decisions

...

Tildelt: kr 8,7 mill.

Prosjektperiode: 2008-2011

Sted: Akershus

INT-BILAT-BILAT-ordningen

Technical cooperation and support for setting up and initial strategy and operation of the National Geotechnical Facility (NGF) of India

-

Tildelt: kr 5,0 mill.

Prosjektperiode: 2008-2014

Sted: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

Real-time reservoir simulation and management

...

Tildelt: kr 5,1 mill.

Prosjektperiode: 2008-2011

Sted: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

SIMLA.Installation - On board monitoring, analysis and decision support during offshore pipe lay operation

...

Tildelt: kr 4,4 mill.

Prosjektperiode: 2008-2011

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Oljelense generasjon III

Dagens oljevernutstyr har begrensninger tilknyttet bølgehøyde, strøm og det å operere i mørke. Dette kan føre til at en i praksis bare kan kontrollere oljesøl i 40-50% av tiden. I tillegg tar det i mange tilfeller lengre tid å mobilisere og plassere utsty r i opptaksposisjon enn det tar olje å dr...

Tildelt: kr 99 999

Prosjektperiode: 2008-2009

Sted: Nordland - Nordlánnda

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Akselerert hydratisering / herde- stabiliseringsprosess samt granulering av borekaks

Prosjektet er en videreutvikling av pågående borekaksprosjekter ved Sintef, Trondheim og Sintef Byggforsk, Oslo. Prosjektene ledes av prof. Harald Justnes, Sintef, Trondheim samt av to sentrale medarbeidere. Dr. ing. Hedda Vikan, Sintef, Trondheim og Osl o, innen sementteknologi, og forsker, dok...

Tildelt: kr 99 999

Prosjektperiode: 2008-2008

Sted: Agder

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Remote and Continuous Reservoir Pressure Monitoring using Sealed Annulus Measurement Device

There is currently a need to improve the understanding of reservoir properties to enhance the development strategy of hydrocarbon discoveries. Especially the vertical communication within a reservoir is often highly uncertain. The ability to quantify the vertical communication within reservoir se...

Tildelt: kr 99 999

Prosjektperiode: 2008-2009

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Environmentally friendly chemical tracers for production monitoring in sensitive Arctic areas

...

Tildelt: kr 2,0 mill.

Prosjektperiode: 2008-2010

Sted: Trøndelag - Trööndelage

IS-BILAT-Mobilitet Norge-USA /Canada

A petroleum geology cooperation between UTIG and UiS

Four main areas of research intend to be initiated during the visit of Dr. Paul Mann in Stavanger. 1.Petroleum Geology program, structural geology and subsurface interpretation, at the University of Stavanger: The design of a course in structural styles using subsurface data worldwide. We can be...

Tildelt: kr 95 000

Prosjektperiode: 2008-2009

Sted: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Development and qualification of technical solutions for an electrically controlled subsea x-mas tree

...

Tildelt: kr 13,6 mill.

Prosjektperiode: 2008-2010

Sted: Buskerud

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Arctic standards

In cooperation with Petromaks develop projects on Russian Environmental Standards. Russia has over many years developed "Maximum Permissible Levels" (MPL)for a number of contaminants, chemical and physical topics in water, soil and biota. These standards are base for their national environmental ...

Tildelt: kr 99 999

Prosjektperiode: 2008-2009

Sted: Troms - Romsa - Tromssa

DEMO2000-Prosj.ret tekn.utv. petro.virk

Ice Model Testing of Structures with a Downward breaking Cone in the Waterline

...

Tildelt: kr 1,0 mill.

Prosjektperiode: 2008-2009

Sted: Akershus

PETROMAKS2-Stort program petroleum

MaxWells - Wells for Maximum Value Creation

Primary objective of project: To advance the state of the art in decision support methodology and closed loop control to meet current and future challenges of constructing smart well systems for the Norwegian oil and gas industry, taking into full conside ration the new environment established by...

Tildelt: kr 12,5 mill.

Prosjektperiode: 2008-2013

Sted: Rogaland