0 antall prosjekter

TU-Tungt utstyr

Application for Purchase of Advanced Geomechanical Testing Equipment

The main objective of the application is to acquire new experimental equipment at NGI dedicated to geomechanical testing at high pressure and temperature with geophysical monitoring and non-destructive real time visualization of the rock internal porous s tructure. The main components are: - Infi...

Tildelt: kr 3,0 mill.

Prosjektperiode: 2007-2007

Sted: Oslo

SIPOPETR-SIP-OED Petroleumssektoren

Integrated Petroleum Reservoir Geomechanics and Geophysics

The 3-year strategic research programme has four main focus areas: (1) Characterisation of geomaterials, including fault and fractures. (2) Wellbore stability and completion (3) Reservoir Monitoring (4) Instrumentation for underwater technology. Each issu e will be prioritized and developed over ...

Tildelt: kr 4,5 mill.

Prosjektperiode: 2006-2009

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Large Strain Testing of Fault Seals. Laboratory Experiments and Development of fault Seal Models

...

Tildelt: kr 2,3 mill.

Prosjektperiode: 2003-2005

Sted: Oslo